Gravity Drain Arrangement
Figure 3-3.
Gravity Drain Arrangement
In a gravity drain arrangement, the rinse solution moves through the
main peristaltic pump to the inlet at the bottom of the rise station, as
shown in Figure 3-3. It then drains out the bottom of the rinse station by
means of a gravity drain. The main pump is used to supply rinse
solution to the rinse station. The auxiliary pump is not used.
To connect the rinse station using a gravity drain, complete the
following steps:
1)
Connect the rinse solution to the main on-board peristaltic
pump by inserting the 3mm (milimeter) i.d. Tygon
®
tubing
onto the inlet at the top of the pump.
2)
Connect the peristaltic pump to the rinse station by
completing the following steps.
Use two pieces approximately 30cm (centimeters) of the 3mm
Tygon
®
tubing provided for the rinse solution uptake.
Содержание ASX-1400
Страница 1: ...ASX 1400 Autosampler Operator s Manual ...
Страница 12: ...Contents ...
Страница 17: ...Preface ...
Страница 23: ...1 Introduction ...
Страница 31: ...2 Preparing for Installation ...
Страница 35: ...3 Installing the Autosampler ...
Страница 39: ...ASX 1400 Autosampler Operator s Manual Installing the Autosampler 3 5 Figure 3 2 Mounting of Z Drive Assembly ...
Страница 43: ...ASX 1400 Autosampler Operator s Manual Installing the Autosampler 3 9 Figure 3 2 Pumped Drain Arrangement ...
Страница 52: ...4 Verifying Installation ...
Страница 60: ...5 Using the Autosampler ...
Страница 68: ...6 1 6 Maintaining the Autosampler ...
Страница 76: ...7 Troubleshooting the Autosampler ...
Страница 81: ...8 Appendix A ...