FibeAir® IP-10G
Installation Guide
Ceragon Proprietary and Confidential
Page 58 of 71
FIBEAIR IP-10 LINK COMMISSIONING LOG
(continued)
6. COMMISSIONING TESTS
Site 1
Site 2
Front panel LEDs:
All green
All green
Line loopback:
Pass
Pass
IF loopback:
Pass
Pass
RFU loopback:
Pass
Pass
Fast Ethernet test:
Pass
Pass
Gigabit Ethernet test:
Pass
Pass
Wayside E1 test:
Pass
Pass
Wayside Eth test:
Pass
Pass
Switching test:
Pass
Pass
7. MANAGEMENT CONFIGURATION
Site 1
Site 2
Eth Main IP address:
Default router:
In-band enabled?
Gateway/NE:
In-band channel 1:
In-band channel 2:
Ring IP address:
Ring IP mask:
Network ID:
8. REMARKS/NOTES