11.
Acceptance and Commissioning Procedures
This section provides Ceragon's recommended Acceptance and
Commissioning Procedure for a FibeAir IP-10 system. Acceptance and
commissioning should be performed after initial setup is complete.
The purpose of this procedure is to verify correct installation and operation of
the installed link and the interoperability with customer end equipment.
Ceragon's Acceptance and Commissioning procedure includes the following
stages:
Site Acceptance Procedure
Commissioning of radio link in a 1+0 configuration
Commissioning of radio link in a 1+1 configuration
Commissioning of radio link in a 2+0 or 2+2 XPIC configuration
The Site Acceptance Procedure is a checklist that summarizes the installation
requirements of the site at which the products were installed.
The commissioning tests cover the required configuration information that
should be recorded, and the tests that should be performed on the radio link
in 1+0, 1+1, and 2+0 configurations.