FibeAir® IP-10G
Installation Guide
Ceragon Proprietary and Confidential
Page 49 of 71
11.4.1.4 Management Verification
Launch the Web EMS on your laptop browser.
Verify that you can manage the link and that you are able to perform
changes to the link configuration (frequency channel, Tx power, system
name, time and date, etc.) via the Web EMS.
Verify that the Web EMS reports the correct parameters when performing
the above.
Verify that there are no active alarms on the link.
If the management station is located at a remote site (Network Operation
Center), verify that the management station can manage the link and
receive traps.
11.4.1.5 Loopback Operation
Perform, IDU-IF loopback, RFU loopback, and remote loopback, and verify
that the system operates accordingly.