FibeAir® IP-10G
Installation Guide
Ceragon Proprietary and Confidential
Page 11 of 71
6.
Preparing for Installation
This section provides instructions for transporting, inspecting, and unpacking
the equipment for an IP-10 system prior to installation.
6.1
Packing
The equipment is packed at the factory, and sealed moisture-absorbing bags
are inserted.
6.2
Transportation
The equipment is prepared for public transportation. The cargo must be
kept dry during transportation, in accordance with ETS 300 019-1-2, Class
2.3.
It is recommended to transport the equipment to the installation site in its
original packing case.
If intermediate storage is required, the packed equipment must be stored
in dry and cool conditions and out of direct sunlight, in accordance with
ETS 300 019-1-1, Class 1.2.
6.3
Inspection
Check the packing lists, and ensure that the correct part numbers and
quantities of components arrived.
6.4
Unpacking Equipment at the Site
A single FibeAir system (1+0) is shipped in 4 crates. Upon delivery, make sure
that the following items are included:
Two indoor units (IDUs) and accessories
Two radio frequency units (RFUs)
Unpack the contents and check for damaged or missing parts. If any part is
damaged or missing, contact your local Ceragon distributor.