FibeAir® IP-10G
Installation Guide
Ceragon Proprietary and Confidential
Page 2 of 71
Notice
This document contains information that is proprietary to Ceragon Networks
Ltd. No part of this publication may be reproduced, modified, or distributed
without prior written authorization of Ceragon Networks Ltd. This document
is provided as is, without warranty of any kind.
Registered Trademarks
Ceragon Networks® is a registered trademark of Ceragon Networks Ltd.
FibeAir® is a registered trademark of Ceragon Networks Ltd. CeraView® is a
registered trademark of Ceragon Networks Ltd. Other names mentioned in
this publication are owned by their respective holders.
Trademarks
CeraMap™, PolyView™, EncryptAir™, ConfigAir™, CeraMon™, EtherAir™, and
MicroWave Fiber™, are trademarks of Ceragon Networks Ltd. Other names
mentioned in this publication are owned by their respective holders.
Statement of Conditions
The information contained in this document is subject to change without
notice. Ceragon Networks Ltd. shall not be liable for errors contained herein
or for incidental or consequential damage in connection with the furnishing,
performance, or use of this document or equipment supplied with it.
Open Source Statement
The Product may use open source software, among them O/S software
released under the GPL or GPL alike license ("GPL License"). Inasmuch that
such software is being used, it is released under the GPL License, accordingly.
Some software might have changed. The complete list of the software being
used in this product including their respective license and the aforementioned
public available changes is accessible
Information to User
Any changes or modifications of equipment not expressly approved by the
manufacturer could void the user’s authority to operate the equipment and
the warranty for such equipment.
Revision History
Rev Date
Author
Description
Approved by
Date
D
September 7,
2011
Baruch Gitlin System installation guide for
IP-10G.
Tomer Aizenberg, Amit Stark,
Ilan Benoliel, Rami Lerner, Uri
Sela, Ari Bachman
September 6,
2011
E
June 14, 2012 Baruch Gitlin Update initial configuration
instructions and acceptance
and commissioning
procedures.
Erez Aviv
June 14, 2012