9. Operator installation
As the foundation box is liable to fill with
water during rainfall, it is critical that an
adequate drainage system is prepared.
Refer to step 9.
Foundation box installation
1. Determine the correct position for the foundation box, i.e.
standard
or
inside
.
To simplify the installation process, it is recommended that the existing gate is removed
from the pillar before proceeding.
FIGURE 5. STANDARD MOUNTING CONFIGURATIONS
FIGURE 6. INSIDE MOUNTING CONFIGURATIONS
page 15
Inside mounting configurations
Standard mounting configurations
Содержание BENINCA IT24N
Страница 1: ...UNDERGROUND SWING GATE OPERATOR IT24N BENINCA installation manual IT24N...
Страница 44: ...Notes...
Страница 45: ...Notes...
Страница 46: ...Notes...
Страница 47: ...Notes...