2. Dig a hole for the foundation box - the size
of the hole being adequate to securely
anchor the foundation box taking into
consideration:
Weight of the gate resting on the
foundation box
Condition of the soil around the
foundation box
4. Fold the two anchor tabs at 45° away from
the base of the foundation box just prior to
inserting it into the hole.
page 16
FIGURE 9
3. Cast the base of the hole in a quick-drying
concrete, ensuring the base is level and that
the foundation box when inserted into
position, will be flush with the ground.
Содержание BENINCA IT24N
Страница 1: ...UNDERGROUND SWING GATE OPERATOR IT24N BENINCA installation manual IT24N...
Страница 44: ...Notes...
Страница 45: ...Notes...
Страница 46: ...Notes...
Страница 47: ...Notes...