17
screws M6x16
reference
pin
MPAF...
MPAU
FIG. 14 – ASSEMBLY OF THE
TYPE “DBG-F2” CLAMP
Drilling machine
front plate
DBG-F2 Clamp
30
7.2) Assembly of the DBG-F2 clamping device on the drill
The
DBG-F2
clamping device is fitted to the front plate of the drill, centred by means of the refer-
ence pin supplied and secured with the two socket head cap screws
M8x25
(30) also supplied.
The assembly is illustrated in Fig. 14.
7.3) Assembly positioning templates
(Ref. to Fig. 15)
NOTE: Only Cembre positioning templates and jigs are to be used with the rail drill.
7.3.1)
The type
MPAF
.. and
MPAU
positioning templates are secured to the front plate (04) of
the drill by means of the two socket head cap screws
M 6x16
supplied.
FIG. 15 – ASSEMBLY OF TEMPLATES