ITEMS TO ROUTE BEFORE INSTALLING THE EVAPORATOR UNIT
Routing Instructions:
1.
Route the line set from the condensing unit to the desired evaporator unit installation location.
2.
Route the display cable from the desired location to the evaporator unit installation location (see page 23 for more
display information).
3.
Route the bottle probe cable from the desired thermostat bottle location to the evaporator unit installation
location (see page 22 for more bottle probe information).
4.
Route the drain line from a proper discharge location to the evaporator unit installation location (see page 21 for
more drain line information).
5.
Route the power cable wiring to the evaporator unit installation location.
ITEMS TO ROUTE
55
°
F
POWER CABLE
DRAIN LINE
DISPLAY CABLE
BOTTLE PROBE
LINE SET