ENGLISH
•
CEDIMA
®
• Technical Documentation • All rights reserved as per DIN 34 • Subject to modifications due to progressive development •
5-2
Maintenance and care
5.4
Maintenance intervals table for the
CEDIMA
®
joint cutter CF-12.4 E-TR
You will fi
nd the description of the maintenance work in the following and appropriate sections/chapters of this operating manual.
The table can be updated by
CEDIMA
®
at any time (e.g. to comply with technical necessities and developments)! Please ask about
it at
CEDIMA
®
!
before each start-up
after work
every working day
for the first time after 10 operat
-
ing hours
weekly
after 1 month
after 3–6 months
annually
on distur- bances
after da
m
ag
es
entire machine
3
1
3
3
electrical systems
7
7
7
7
7
4
tool receptacle
flanges and blade receptacle
1, 2
3
4
tool (diamond saw blade)
3, 6
1
4
control elements (hand crank, lever
,
…)
3
1
4
V-belts
3
5
3
4
3
4
threaded spindle
2
3
4
motor housing
1
motor
3, 7
fixing brake
3
3, 5
4
accessible fi
elements (nuts, screws, …)
5
1 cleaning 2 lubricants, fats, oils, corrosion protection 3 control (optical, function)
4 exchange, replacing 5 retightening, adjusting 6 exchange if necessary
7 legal safety checks on electrical
systems (see table 1A
and 1B)