This document is the property of Tecora and can not be duplicated without permission
Ref : EN MU DSM 46 V2
Page 15 of 49
3.2
Data displayed during the sampling
When the programmed start time arrives, the instrument turn on and display the following
parameters:
•
Sample 1 of 1
see chapter 6 Sequential Sampling
•
Programmed
Cycle
chapter 6 Sequential Sampling
•
Programmed Sampling
Duration
•
Elapsed Time
is the effective sampling time (pump
ON) from the start
•
Volume C.V.
is the volume expressed in m
3
sampled
until this moment and referred to the dry gas meter conditions.
•
Volume std
is the volume expressed in m
3
sampled until this moment and referred to the
normalized conditions (temperature and pressure) where the temperature is the one
selected during the sampling program and the pressure is 101.3 kPa.
•
Temp C.V.
is the gas temperature inside the dry gas meter expressed in °C
Sample n°
1 of 1
Cycle 24:00
Duration 24:00
Elapsed time
00:12:06
Volume C.V. m
3
0.06376
Volume std. m
3
0.06459
Temp C.V. °C
27.11
PAUSE TO STOP