CCH® Elite Plus Operation and Installation Manual (Model CCH1-HCE) Rev 1.0 3/2020
15
6.1.3
System Power Up
To power up the system:
1.
Connect the control box to a dedicated AC power source in accordance with the site requirements section 4.1.1.
2.
After a 30 sec boot-up period, the box will power up with the indicator lights turning on. Confirm the following indicator lights are on:
Power : red/off.....A red OFF indicator light means the box is powered and on standby.
Mode : green/ORP or MANUAL.....Indicates the last operating mode the control box was in.
Flow : green…..Indicates there is flow in the pool recirculation piping. If there is no light, there is either no flow in the piping, the
orange flow switch cable is not correctly connected to the flow switch, or the flow switch is bad.
FEED, WASH, ALERT…..Off when the power is on Off.
3.
Slowly open the inlet ball valve to allow water to flow through the manifold.
4. Press the control box power button to energize the system.
5. Put the control box on manual mode to energize the feed solenoid valve and send water into the hopper.
6.
Check for leaks from lines, valves, and connections. If necessary, tighten parts.
7. Put the control box back on ORP mode.
8. Connect the control box ORP plug to an ORP (chemical controller) chlorine demand output.
9.
Use the ORP controller to send a chlorine feed signal to confirm operation of the CCH® Elite control box.
10.
When the chlorine signal is removed, verify that the controller goes into four wash cycles of 15 sec On and 15 sec Off.
11.
Once all operating conditions are verified, press the power button on the control box to put it back into standby.