25
|
P a g e
cascadesciences.com
|
Tel. 503 847-9047
INSTALLATION
L
IFTING AND
H
ANDLING
The oven is heavy. Use appropriate lifting devices that are sufficiently rated for these loads. Follow
these guidelines when lifting the oven:
•
Lift the oven only from its bottom surface.
•
Doors, handles, and knobs are not adequate for lifting or stabilization.
•
Restrain the oven completely while lifting or transporting so it cannot tip.
•
Remove all moving parts, such as shelves and trays, and lock doors in the closed position
during transfers to prevent shifting and damage.
L
EVELING
Install the 4 leveling feet with the 4 corner holes on the bottom of the oven.
The unit must be level and stable for safe operation.
Note:
To prevent damage when moving the unit, turn all four leveling feet so that the leg of each
foot sits inside the unit.
Содержание CVO-2
Страница 1: ...Installation Operation Manual CVO 2 Benchtop Vacuum Ovens...
Страница 6: ...6 P a g e cascadesciences com Tel 503 847 9047 TABLE OF CONTENTS...
Страница 8: ...8 P a g e cascadesciences com Tel 503 847 9047 CERTIFICATIONS...
Страница 12: ...12 P a g e cascadesciences com Tel 503 847 9047 SPECIFICATIONS...
Страница 20: ...20 P a g e cascadesciences com Tel 503 847 9047 RECEIVING...
Страница 30: ...30 P a g e cascadesciences com Tel 503 847 9047 INSTALLATION...
Страница 32: ...32 P a g e cascadesciences com Tel 503 847 9047 SYMBOLS...
Страница 50: ...50 P a g e cascadesciences com Tel 503 847 9047 MAINTENANCE...
Страница 52: ......