21
|
P a g e
cascadesciences.com
|
Tel. 503 847-9047
INSTALLATION
I
NSTALLATION
P
ROCEDURE
C
HECKLIST
For installing the oven in a new workspace location.
Pre-Installation
Verify a vacuum supply source suitable for your application is available and
can be connected to the oven, page 14.
•
See page 28 for the oven gas and vacuum port locations.
Check that the required ambient conditions for the unit are met, page 22.
Check that the spacing clearance requirements are met, page 22.
•
Unit dimensions may be found on page 10.
Check that a suitable electrical outlet and power supply is present, page 23.
Install the oven in a suitable workspace location
Review the lifting and handling instructions, page 25.
Install the leveling feet, page 25.
Install the oven in its workspace location, page 26.
Set up the oven for use
Clean the oven shelving. Clean the chamber if needed, page 26.
Install the shelving, page 27.
Connect the vacuum supply to the oven, page 28.
Optional
:
Connect the oven to an inert backfilling gas, page 29.
Содержание CVO-2
Страница 1: ...Installation Operation Manual CVO 2 Benchtop Vacuum Ovens...
Страница 6: ...6 P a g e cascadesciences com Tel 503 847 9047 TABLE OF CONTENTS...
Страница 8: ...8 P a g e cascadesciences com Tel 503 847 9047 CERTIFICATIONS...
Страница 12: ...12 P a g e cascadesciences com Tel 503 847 9047 SPECIFICATIONS...
Страница 20: ...20 P a g e cascadesciences com Tel 503 847 9047 RECEIVING...
Страница 30: ...30 P a g e cascadesciences com Tel 503 847 9047 INSTALLATION...
Страница 32: ...32 P a g e cascadesciences com Tel 503 847 9047 SYMBOLS...
Страница 50: ...50 P a g e cascadesciences com Tel 503 847 9047 MAINTENANCE...
Страница 52: ......