Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.
Catalog No. 04-53190079-01
Printed in U.S.A.
Form 19MV-CLT-1SS
Pg CL-1
4-22
Replaces: NEW
INITIAL START-UP CHECKLIST
FOR 19MV SEMI-HERMETIC TWO-STAGE CENTRIFUGAL LIQUID CHILLER
(Remove and use for job file.)
MACHINE INFORMATION:
DESIGN CONDITIONS:
REFRIGERANT: Type:
Charge
START-UP TO BE PERFORMED IN ACCORDANCE WITH APPROPRIATE MACHINE START-UP INSTRUCTIONS
JOB DATA REQUIRED:
1. Machine Installation Instructions
Yes
No
2. Machine Assembly, Wiring and Piping Diagrams
Yes
No
3. Starting Equipment Details and Wiring Diagrams
Yes
No
4. Applicable Design Data (see above)
Yes
No
5. Diagrams and Instructions for Special Controls
Yes
No
INITIAL MACHINE PRESSURE:
RECORD ACTUAL PRESSURE DROPS Evaporator
Condenser
CHARGE REFRIGERANT: Initial Charge
Final Charge After Trim
NOTE: To avoid injury to personnel and damage to equipment or
property when completing the procedures listed in this start-up
checklist, use good judgment, follow safe practices, and adhere to
the safety considerations/information as outlined in preceding sec-
tions of this Start-Up, Operation, and Maintenance Instructions
document.
NAME
SALES ORDER NO.
ADDRESS
MODEL
CITY
STATE
ZIP
S/N
TONS
(kW)
BRINE
FLOW
RATE
TEMPERATURE
IN
TEMPERATURE
OUT
PRESSURE
DROP
PASS
SUCTION
TEMPERATURE
CONDENSER
TEMPERATURE
EVAPORATOR
******
CONDENSER
******
CHILLER LINE SIDE:
Volts
FLA
OLTA
CARRIER OBLIGATIONS:
Disassembled at Job Site . . . . . . . .
Yes
No
Assemble... . . . . . . . . . . . . . . . .
Yes
No
Leak Test . . . . . . . . . . . . . . . . . . .
Yes
No
Dehydrate . . . . . . . . . . . . . . . . . .
Yes
No
Charging . . . . . . . . . . . . . . . . . . .
Yes
No
Operating Instructions
Hrs.
YES
NO
Was Machine Tight?
If Not, Were Leaks Corrected?
Was Machine Dehydrated After Repairs?
Содержание AquaEdge 19MV
Страница 49: ...49 Fig 46 SIOB...
Страница 50: ...50 Fig 47 IOB2...
Страница 51: ...51 Fig 48 19MV Auxiliary Controls Wiring...
Страница 52: ...52 Fig 49 Motor Bearing Control Board Wiring...