CL-2
-
- -
- -
-
- -
-
- -
-
- -
-
- -
- -
-
- -
-
- -
-
- -
- -
-
- -
-
- -
-
- -
-
- -
- -
-
- -
-
- -
-
- -
-
- -
- -
-
- -
-
- -
-
- -
- -
-
- -
-
- -
-
- -
-
- -
- -
-
- -
-
- -
-
- -
- -
-
- -
-
- -
-
- -
-
- -
- -
-
- -
-
- -
-
- -
-
- -
- -
-
- -
-
- -
-
- -
- -
-
- -
-
- -
-
- -
-
- -
- -
-
- -
-
- -
-
- -
- -
-
- -
-
- -
-
- -
-
- -
- -
-
--
- -
-
- -
- -
-
- -
-
- -
-
- -
- - -
CUT
ALON
G
DOTT
E
D
LI
NE
CU
T
ALONG
DOTTED
LINE
INSPECT WIRING AND RECORD ELECTRICAL DATA:
RATINGS:
Motor Voltage
Motor RLA
Chiller LRA Rating
Actual Line Voltages: VFD
UPS Battery Charge
% Battery Charge Level
%
Verify 6-in. clearance surrounding all VFD enclosure louvers.
Yes
No
Record:
L1 to ground
L2 to ground
L3 to ground
L1 to L2
L1 to L3
L2 to L3
NOTE: The % of voltage imbalance should be the same for the two different measurements
Visually inspect top of the electrical enclosures for penetrations and internally for metal particulate:
Yes
No
VFD Manufacturer ___________________________
VFD Serial Number __________________________
Mfd in _____________________________________
VFD Nameplate I.D. Number ___________________
VFD Nameplate Input Rating ___________________
on ________________________________________
CONTROLS: SAFETY, OPERATING, ETC.
Perform Quick Calibration (Yes/No)
INITIAL START:
Line up all valves in accordance with instruction manual:
Start water pumps and establish water flow:
Check compressor motor rotation (second stage suction housing sight glass) and record: Counter-clockwise
Restart compressor, bring up to speed (operating for at least 2 minutes), and shut down.
Any abnormal coastdown noise? If yes, determine cause:
Yes
No
START MACHINE AND OPERATE. COMPLETE THE FOLLOWING:
A: Trim charge and record under Charge Refrigerant section on page CL-1.
B: Take at least two sets of operational log readings and record.
C: Give operating instructions to owner’s operating personnel. Given at:
Hours
D: Call your Carrier factory representative to report chiller start-up.
E: Return a copy of this checklist to the local Carrier Service office.
SIGNATURES:
CARRIER
CUSTOMER
TECHNICIAN
REPRESENTATIVE
DATE
DATE
COMPRESSOR MOTOR AND CONTROL PANEL
MUST
BE PROPERLY AND INDIVIDUALLY
CONNECTED BACK TO THE EARTH GROUND IN THE VFD (IN ACCORDANCE WITH CERTIFIED
DRAWINGS). THE TRANSFORMER SUPPLYING POWER TO THE UNIT SHOULD BE A WYE
SECONDARY WITH SOLIDLY GROUNDED NEUTRAL.
Yes
WATER/BRINE PUMP CONTROL: Can the Carrier controls independently start the pumps?
Condenser Water Pump
Yes
No
Chilled Water Pump
Yes
No
RUN MACHINE:
Do these safeties shut down machine?
Condenser Water Flow
Yes
No
Chilled Water Flow
Yes
No
Pump Interlocks (optional)
Yes
No
Содержание AquaEdge 19MV
Страница 49: ...49 Fig 46 SIOB...
Страница 50: ...50 Fig 47 IOB2...
Страница 51: ...51 Fig 48 19MV Auxiliary Controls Wiring...
Страница 52: ...52 Fig 49 Motor Bearing Control Board Wiring...