28
Example: SPP Equipment Summary Screen
A13121C
6.2.
Installation
Touch
INSTALLATION
to perform the start--up process in order to learn all
equipment in system. Select
FULL INSTALLATION
, then touch
NEXT
to initiate
the process.
Touch
Airflow Verification Test
to perform a duct assessment. This can be done if
duct modifications have been made since installation of the Infinity System Control.
Duct assessment can be performed without performing a full system install.
A14222
Содержание A180218C
Страница 2: ...US Patents Carrierr U S Pat No 7 243 004 Carrierr U S Pat No 7 775 452 pointSETt U S Pat No 7 415 102...
Страница 64: ...54 A160188C...
Страница 112: ...102 A160170 NIM Chart...
Страница 113: ...103 A160171 Wiring Diagram Single Stage Non Communicating Heat Pump NIM...
Страница 114: ...104 A160172 Wiring Diagram Two Stage Non Communicating Heat Pump NIM...
Страница 115: ...105 R G FE Fan Coil or Variable Speed Furnace A07114 G Input Wiring for Blower Operation...
Страница 116: ...106 R G FE Fan Coil or Variable Speed Furnace A07115 G Input Wiring for System Shutdown...
Страница 119: ...109 NOTES...