Consult application data section in the Product Data lit-
erature and job design requirements to determine flow rate
requirements for a particular installation.
Table 34 — Nominal and Minimum Cooler
Fluid Flow Rates
30GTN,R
UNIT
SIZE
NOMINAL FLOW
RATE*
MINIMUM FLOW
RATE (See Notes)
Gpm
L/s
Gpm
L/s
040
86
5.43
36.8
2.32
045
101
6.37
37.7
2.38
050
123
7.76
37.7
2.38
060
151
9.53
47.5
3.00
070
173
10.91
47.5
3.00
080,230B
192
12.11
66.7
4.20
090,245B
216
13.62
59.5
3.75
100,255B,270B
240
15.14
84.1
5.30
110,290B,315B
264
16.65
84.1
5.30
130
300
18.9
110
6.9
150,230A-255A
348
21.9
110
6.9
170,270A,330A/B,
360B (50 Hz)
384
24.2
120
7.5
190,290A,360A/B (60 Hz),
360A (50 Hz),390B
432
27.2
120
7.5
210,315A,390A,420A/B
480
30.2
148
9.3
LEGEND
ARI
— Air Conditioning and Refrigeration Institute
Gpm — Gallons per minute (U.S.)
L/s
— Liters per second
N
— Liters per kW
V
— Gallons per ton
*Nominal flow rates required at ARI conditions are 44 F (6.7 C) leaving-
fluid temperature, 54 F (12.2 C) entering-fluid temperature, 95 F
(35 C) ambient. Fouling factor is .00001 ft
2
•
hr
•
F/Btu (.000018 m
2
•
K/W).
NOTES:
1. Minimum flow based on 1.0 fps (0.30 m/s) velocity in cooler with-
out special cooler baffling.
2. Minimum Loop Volumes:
Gallons = V x ARI Cap. in tons
Liters
= N x ARI Cap. in kW
APPLICATION
V
N
Normal Air Conditioning
3
3.25
Process Type Cooling
6 to 10
6.5 to 10.8
Low Ambient Unit Operation
6 to 10
6.5 to 10.8
Operation Sequence —
During unit off cycle, crank-
case heaters are energized. If ambient temperature is below
36 F (2 C), cooler heaters (if equipped) are energized.
The unit is started by putting the ENABLE/OFF/REMOTE
CONTACT switch in ENABLE or REMOTE position. When
the unit receives a call for cooling (either from the internal
control or CCN network command or remote contact clo-
sure), the unit stages up in capacity to maintain the cooler
fluid set point. The first compressor starts 1
1
⁄
2
to 3 minutes
after the call for cooling.
The lead circuit can be specifically designated or ran-
domly selected by the controls, depending on how the unit
is field configured (for 040-070 sizes, Circuit A leads unless
an accessory unloader is installed on Circuit B). A field con-
figuration is also available to determine if the unit should
stage up both circuits equally or load one circuit completely
before bringing on the other.
When the lead circuit compressor starts, the unit starts with
a pumpout routine. On units with the electronic expansion
valve (EXV), compressor starts and continues to run with
the EXV at minimum position for 10 seconds to purge the
refrigerant lines and cooler of refrigerant. The EXV then moves
to 23% and the compressor superheat control routine takes
over, modulating the valve to feed refrigerant into the cooler.
On units with thermostatic expansion valve (TXV)
(30GTN,R040,045 units with brine option), head pressure
control is based on set point control. When the lead com-
pressor starts, the liquid line solenoid valve (LLSV) is kept
closed for 15 seconds by a time delay relay. The micro-
processor stages fans to maintain the set point temperature
specified by the controller. There is no pumpout sequence
during shutdown of TXV controlled chillers.
On all other units (EXV units), the head pressure is con-
trolled by fan cycling. The desired head pressure set point is
entered, and is controlled by EXV position or saturated con-
densing temperature measurement (T3 and T4). For proper
operation, maintain set point of 113 F (45 C) as shipped from
factory. The default head pressure control method is set point
control. The head pressure control can also be set to EXV
control or a combination of the 2 methods between circuits.
For all units, if temperature reset is being used, the unit
controls to a higher leaving-fluid temperature as the build-
ing load reduces. If demand limit is used, the unit may tem-
porarily be unable to maintain the desired leaving-fluid tem-
perature because of imposed power limitations.
On EXV units, when the occupied period ends, or when
the building load drops low enough, the lag compressors shut
down. The lead compressors continue to run as the EXV closes,
and until the conditions of pumpout are satisfied. If a fault
condition is signaled requiring immediate shutdown,
pumpout is omitted.
Loading sequence for compressors is shown in Tables 5A
and 5B.
66
Содержание 30GTN
Страница 6: ...Fig 1 Typical Control Box 080 110 and Associated Modular Units Shown 6 ...
Страница 7: ...Fig 2 24 V Control Schematic Unit Sizes 040 070 7 ...
Страница 8: ...Fig 3 24 V Control Schematic Unit Sizes 080 110 230B 315B 8 ...
Страница 9: ...Fig 4 24 V Control Schematic Unit Sizes 130 210 230A 315A 330A B 420A B 9 ...
Страница 75: ......