Inverter Hybrid Boiler
16
Checklist prior
to installation
Installation kits materials
NO
Component name
Specifications
Quantity
Remarks
1 Drain Pan
PP
2
2 Drain Pan installation Manual
PAPER
1
3 Finishing tape
PVC FILMa, 30M IVORY
1
4 Pipe finishing materials
CN25
1
5 Other materials
SCREW, GROMMET
1
6 Domestic hot water tank temperature sensor well
WELL, PT1/2
1
7 Domestic hot water tank temperature sensor
10Kohm, L200
1
8 Connector for error output
12PIN, L300
1
Installation materials (optional)
NO
Component name
Specifications
Quantity Remarks
1 Refrigerant connection pipe
OD 9.52mm X 10m
1
liquid pipe
2 Refrigerant connection pipe
OD 15.8mm X 10m
1
gas pipe
3 Insulator for refrigerant pipes
ID 14 X T7 X 5m
2
4 Insulator for refrigerant pipes
ID 14 X T7 X 5m
2
5 Indoor/outdoor unit connection power cable
(3-phase power cable)
2.5
㎟
X 5G X 11m
1
6 Indoor/outdoor unit communication cable
CVV-SB(shield cable) 1.5
㎟
X 2C X 11m
1
7 Copper pipe processed article
PAPER PIPE, ID230 X T3
1
● Installation should be performed by the authorized service center or by a professional
installation agency that has been certified by Carrier.
● This product requires a seperate power supply (400V 50Hz 3-phase 4-wire AC electricity).
A dedicated circuit must be used in the power supply of the hybrid boiler.
● Make sure all of the following components are in place before installing the product.