![Carrier 30AWH-025QI Скачать руководство пользователя страница 20](http://html1.mh-extra.com/html/carrier/30awh-025qi/30awh-025qi_installation-manual_2562143020.webp)
Inverter Hybrid Boiler
18
Base mount
Anti-vibration rubber
Well
ventilated
area
at least
30cm
at least 20cm
at least 1m
at least 1m
Fixing bolt/washer
Product LEG
Selection of installation location
Indoor Unit
● Select a location that can withstand the vibration and weight of the indoor unit.
● The product must be installed indoors (a location in which the product will not be exposed to
snow, rain and a temperature below 0
℃
)
In an environment with a temperature below 0
℃
, water will freeze and may cause damage to the
product.
● A location free from flammable gas leakage and fire sources
● A location in which it is easy to connect to the pipe of outdoor unit and perform water piping and
electrical work
● Electric wiring should be carried out by a qualified, experienced service technician who is familiar
with safety procedures and equipped with proper tools and test instruments.
● A sufficient space not to experience any disturbance or difficulty in air flow is required.
● Do not install the product in a location where it will be exposed to hot air or direct sunlight.
● Do not install the product in a location with a saline atmosphere or exposed to sulphate gas.
● Do not place any obstacle in front of the inlet or outlet of indoor unit.
● A location with excellent drain performance
● A location at least 3 meters away from any object that generates electric noises