7800-25 Series Operations Manual
Rev B 11-10-2020
Page 18 of 56
OPERATION
Before the chamber can be commissioned for use, make sure that the following steps
have been completed:
- Chamber is properly installed and level.
- The appropriate power connected to the chamber.
With the above mentioned steps complete, the power switch located on the right side,
near the top of the unit exterior, can be turned on.
Here is an overview of the home screen.
Menu
Status Bar
Day / Time
Buzzer
Door
Lock
Information
Display
Zone
Start
Sterilization
Cycle
Process
Содержание 7800-25
Страница 1: ...Sterilization Chamber Model 7800 25 ...