OPERATION
Before the incubator can be commissioned for use, make sure that the following steps
have been completed:
- Chamber is properly installed and level.
- The appropriate utilities connected to the chamber.
With the above mentioned steps complete, the power switch located on the right side,
near the top of the unit exterior, can be turned on.
Within a few minutes, the temperature will begin to approach setpoints. Here is an
overview of the home screen.
Setpoint
Menu
Settings
Menu
Actual Humidity
(HUMD311 option)
Actual
Temperature
Status Bar
Speaker
Day / Time
Lockout
icon
Parameter
Display
Zones
Trend
Graph
Lights
(optional
7340)
Содержание 7340-25
Страница 1: ......
Страница 80: ...7340_7350 25 33 Series Operations Manual Rev J 3 31 21 Page 80 of 92 ELECTRICAL SCHEMATICS ...
Страница 81: ...7340_7350 25 33 Series Operations Manual Rev J 3 31 21 Page 81 of 92 ...
Страница 82: ...7340_7350 25 33 Series Operations Manual Rev J 3 31 21 Page 82 of 92 ...
Страница 83: ...7340_7350 25 33 Series Operations Manual Rev J 3 31 21 Page 83 of 92 ...
Страница 84: ...7340_7350 25 33 Series Operations Manual Rev J 3 31 21 Page 84 of 92 ...
Страница 85: ...7340_7350 25 33 Series Operations Manual Rev J 3 31 21 Page 85 of 92 ...
Страница 86: ...7340_7350 25 33 Series Operations Manual Rev J 3 31 21 Page 86 of 92 ...
Страница 87: ...7340_7350 25 33 Series Operations Manual Rev J 3 31 21 Page 87 of 92 ...
Страница 88: ...7340_7350 25 33 Series Operations Manual Rev J 3 31 21 Page 88 of 92 ...