7340_7350-25-33 Series Operations Manual
Rev J 3-31-21
Page 13 of 92
INSTALLATION
Unpacking
Your new unit has been thoroughly packaged to avoid shipping damage. However, the
unit should be fully inspected upon arrival before signing for receipt. If the package has
visual damage, notes should be made on the freight bill and signed by the delivery
company. In the event of concealed damage after the unit is uncrated, keep the carton
and packaging material. Call the shipping company within 7 days of receipt, request
inspection and retain a copy of the inspection report.
For prolonged periods of inactivity leave the unit unplugged and securely stored.
Caron provides full on-site installation services for all models. Our installation services
guarantees the proper set-up and startup of all equipment. Please contact the Service
Department at 740-373-6809 or
www.caronproducts.com
for details.
For detailed instructions on how to safely remove the chamber off the shipping pallet,
see document located on the chamber.
Choosing a Location
To ensure proper operation, the unit must be located on a firm level surface, capable of
supporting approximately 900 pounds. The unit should be located in an 18°C to 25°C
ambient area and where there is no direct airflow from heating and cooling ducts as well
as out of direct sunlight. Allow four inches of clearance on all sides of the product to
allow for connections and airflow. The unit is designed to be used under the following
conditions:
Indoor use only
Altitude up to 2000m.
Maximum relative humidity: non-condensing
Mains supply voltage fluctuations up to +/- 10% of the nominal voltage;
damage may occur if voltage varies more than 10%
Transient overvoltages up to the levels of overvoltage category II
Temporary overvoltages occurring on the mains power supply
Pollution degree: 2
Ingress protection: IPXO
This product weighs in excess of 500 pounds.
Ensure that sufficient resources are available to
safely move the product.
Содержание 7340-25
Страница 1: ......
Страница 80: ...7340_7350 25 33 Series Operations Manual Rev J 3 31 21 Page 80 of 92 ELECTRICAL SCHEMATICS ...
Страница 81: ...7340_7350 25 33 Series Operations Manual Rev J 3 31 21 Page 81 of 92 ...
Страница 82: ...7340_7350 25 33 Series Operations Manual Rev J 3 31 21 Page 82 of 92 ...
Страница 83: ...7340_7350 25 33 Series Operations Manual Rev J 3 31 21 Page 83 of 92 ...
Страница 84: ...7340_7350 25 33 Series Operations Manual Rev J 3 31 21 Page 84 of 92 ...
Страница 85: ...7340_7350 25 33 Series Operations Manual Rev J 3 31 21 Page 85 of 92 ...
Страница 86: ...7340_7350 25 33 Series Operations Manual Rev J 3 31 21 Page 86 of 92 ...
Страница 87: ...7340_7350 25 33 Series Operations Manual Rev J 3 31 21 Page 87 of 92 ...
Страница 88: ...7340_7350 25 33 Series Operations Manual Rev J 3 31 21 Page 88 of 92 ...