
26
H050002740 rel. 1.1 - 17.05.2021
Checks before commissioning
ENG
4. CHECKS BEFORE COMMISSIONING
Before commissioning the unit, check that:
•
the controller’s output current is greater than or equal to the rated or maximum current specified for the compressor;
•
the working voltage range is correct;
•
the power cables are sized correctly;
•
the cross-section and maximum length of the compressor cables are correct, and that these are connected in accordance
with the wiring diagrams;
•
all of the controller’s inputs are connected correctly.
•
the instructions on installing the individual system components have been followed;
•
the total maximum power of direct current (DC) fans complies with the value shown in the technical specifications table in
all operating conditions. Higher power consumption will cause permanent damage to the controller;
•
if the user terminal is installed inside the cooler cabinet, parameters HIn (terminal inside cabinet) and rIn (Room temperature
when user terminal inside cabinet) are set correctly. See 0300099-.
4.1 User terminal
3
1
2
50002740_002_R01
Buttons
1 display
2 keypad
3 status and operating mode icons
4.1.1
D
isplay
Icon
Description
On
Flashing
Compressor
Active
-
Evaporator fan
Active
-
Lights
On
-
Auxiliary output
Active
-
Clock
Scheduler active
-
Defrost
Active
Awaiting
Service
Maintenance request
-
HACCP
Active
-
Tab. 4.a