docs.carbide3d.com
30
Inserting the Y1-Rail
1.
Slide the integrated v-rails of the Y1-extrusion rail
between the four (4) V-wheels of the Y1-carriage.
Center the rail with the carriage plate. See
Figure 4-7
.
Inserting the Y2-Rail
1.
Slide the integrated v-rails of the Y2-extrusion rail
between the four (4) V-wheels of the Y2-carriage.
Center the rail with the carriage plate. See
Figure 4-8
.
Secure the Gantry
Positioning the Gantry
1.
With the help of another person, very carefully
lift, rotate, and lower the gantry so that the
Y1- and Y2-rails are positioned between the front
and rear endplates. The Y1-rail should be along
the left, the Y2-rail along the right, and the Z-Plus
facing front. See
Figure 4-9
.
Securing the Y1-Rail
The Y1- and Y2- rails will be raised into place one at a time.
The first rail to be lifted (the Y1-rail) is loosely attached to
the endplates with two (2) screws, one front and one
back. This creates a pivot point for rotating the Y2-rail up
and into place
Figure 4-7
Figure 4-8
Figure 4-9
PRO TIP:
During this stage of the assembly, it is
helpful to have another set of hands. The gantry
system is large, heavy, and awkward for one
person to handle alone.
WARNING:
Be sure to insert the Y1-rail right-side
up: M6 holes towards the
REAR
and M4 holes
along the
TOP
.
Содержание SHAPEOKO XXL
Страница 1: ...X X L A S S E MB L Y G U I D E ...
Страница 14: ...docs carbide3d com 12 Figure 2 2 Step 2 Baseframe ...
Страница 20: ...docs carbide3d com 18 Figure 3 2 Step 3 Carriages ...
Страница 29: ...support carbide3d com 27 Figure 4 2 Step 4 Gantry ...
Страница 34: ...docs carbide3d com 32 Figure 5 2 Step 5 Belting ...
Страница 40: ...docs carbide3d com 38 Figure 6 2 Step 6 Drag Chains ...
Страница 48: ...docs carbide3d com 46 Figure 7 2 Step 7 Proximity Switches ...
Страница 52: ...docs carbide3d com 50 Figure 8 2 Step 8 Wiring ...
Страница 57: ...support carbide3d com 55 Figure 9 2 Step 9 Cleanup ...
Страница 60: ...docs carbide3d com 58 Figure 10 2 Step 10 Compact Router ...