![background image](http://html1.mh-extra.com/html/canycom/cmx-224/cmx-224_operators-manual_3990938054.webp)
-45-
Maintenance
5
Greasing Points
• Grease regularly. Insufficient greasing may result in seizure or rusting, affecting
smooth operation of machine.
• When using a manual grease pump, push handle five to six times. When handle
becomes heavy, stop pushing.
• When using a pneumatic grease pump, charge for two to three seconds.
• Set cutting rotary height to the lowest to grease link pivots.
NOTE
Location
Schedule
Grade
1
Propeller shaft
Every 6 Months
Chassis Grease
2
Cutting rotary link pivots
Every 6 Months
Chassis Grease
3
Cutting rotary drive shaft
Every 6 Months
Chassis Grease
Greasing Points (CMX 224)
5332M-0503-010E