background image

-30-

Instruction Manual

D.

  Culture Sample Collection RENATRON

®

 stations - RS-8335

Water culture samples can be easily collected from the RENATRON station by first running the RENATRON Water 

Culture Sample Cycle.

1.  Prepare the RENATRON for sample collection

a.  Ensure that the RENATRON was sanitized with the calibration cell in place, allowed to dwell for at least 

6 hours, and was undisturbed since the initiation of the Sanitize Cycle.

2.  Initiate the Water Culture Sample Cycle

a.  Press the

 "ON"

 switch.

b.  Press the 

"MUTE ALARM" 

and

 "RESET" 

switches to change to the "CH" mode.

c.  Press the following switches in the following order:

 

"MUTE ALARM"

 "RESET"

 "DISPLAY"

d.  The Volume Display window will read "CUL" and the Program Step display window will read "CC".
e.  Press the 

"START PROCESS" 

switch

f.  At the end of the program step

 9

, the 

"PROCESS COMPLETE"

 message will illuminate and the Program 

Step display window will read "SA".

3.  Sample Collection

a.  Using aseptic technique, collect a sample from the calibration cell for a culture of water from the 

RENATRON station.

b.  After the sample has been collected, press the

 "RESET"

 switch. The RENATRON II 100 Series Station 

is now ready for calibration verification and then for reprocessing dialyzers. 

E. 

Storage When Not In Use

The RENATRON II 100 Series station should be stored in a protected location. Avoid high-traffic areas where the 

machine might get damaged and avoid high humidity.

The RENATRON II 100 Series station is a high-quality, precision device and should be treated as such. The station 

has been designed to withstand the rigors of normal use and, with reasonable care and maintenance, should provide 

many hours of trouble-free operation.

MEDIVATORS maintains a special repair and calibration facility to provide its customers with expert service for its products. 

If your RENATRON II 100 Series station requires servicing, we recommend that you contact our Renal Technical 

Support. MEDIVATORS conducts periodic service/maintenance seminars for the RENATRON II 100 Series. Contact 

our Renal Technical Support or your sales representative for information regarding these classes.

Содержание MEDIVATORS renatron II 100 Series

Страница 1: ...100 Series Dialyzer Reprocessing System INSTRUCTION MANUAL MODEL RS 8330 RS 8335 100 Series...

Страница 2: ...IN PERASSAY ACTRIL and ON DEMAND are registered trademarks of Medivators Inc Formula 409 is a registered trademark of the Clorox Company 50096 725 Rev D 2015 Medivators Inc Printed and Assembled in th...

Страница 3: ...tions 12 8 Computer Installation Instructions 16 9 Daily Machine Sanitize Procedure 17 10 Operating Procedures 17 11 Bar Code Scanner Procedures 23 12 Storage and Handling for Reprocessed Dialyzers 24...

Страница 4: ...and delivery of proportioned RENALIN 100 Cold Sterilant solution to hollow fiber dialyzers It is also indicated for record keeping of these functions The RENATRON II 100 Series system is indicated fo...

Страница 5: ...TION THE OPERATOR SHOULD BE FAMILIAR WITH THE SAFE HANDLING TECHNIQUES FOR THE MACHINE AND THE RENALIN 100 COLD STERILANT AND WITH THE RECOMMENDED FIRSTAID PROCEDURES IN CASE OF CONTACT WITH OR EXPOSU...

Страница 6: ...tem for rinsing cleaning and testing of hollow fiber dialyzers and for delivery of Proportioned RENALIN 100 Cold Sterilant solution to the dialyzers The RENATRON II 100 Series System can also perform...

Страница 7: ...dialyzer measured priming volume may differ from advertised volume by as much as 20 It is recommended that the operator measure new dialyzer volume with a known calibrated RENATRONII 100 Series to det...

Страница 8: ...nstruction Acrylic PVC ABS Polypropylene Delrin Ethylene Propylene Viton Rubber Stainless Steel B Electrical Leakage Current risk current Each RENATRON II 100 Series is allowed a leakage current less...

Страница 9: ...3 cm Weight 3 2 lbs 1 5 kg 4 Report Printer approximately Width 17 7 inches 50 cm Depth 14 6 inches 37 cm Height 5 7 inches 15 cm Weight 11 7 lbs 5 3 kg 5 Monitor LCD approximately Width 14 8 inches 3...

Страница 10: ...e RENATRON station will perform a header leak test between program Step 2 and 3 If a Pressure Fail message appears in Step H 2 verify that the blood port connections are secure and that the dialyzer h...

Страница 11: ...display to SEL Reset must be used at the end of a cycle or in an alarm state locked out or disabled at all other times to guarantee automatic transfer of reprocessing data to the computer 7 DISPLAY sw...

Страница 12: ...er to the respective manuals for detailed information about the computer monitor and printer controls and indicators IMPORTANT TO ISOLATE THE STATION FROM THE ELECTRICAL SUPPLY YOU MUST DISCONNECT THE...

Страница 13: ...13 Instruction Manual Figure 1 RS 8335...

Страница 14: ...14 Instruction Manual Figure 2 RS 8330...

Страница 15: ...he water pressure gauge block to the back of the drip tray using the screws provided Be absolutely certain that no water leaks exist and all connections are secure G Connect the dialysate line quick d...

Страница 16: ...the computer manufacturer s manual for instructions for connecting the monitor keyboard and mouse G Power on sequence of computer system 1 Printer s 2 Monitor 3 Computer 4 Interface module 5 RENATRON...

Страница 17: ...UP THE RENALOG RM PROGRAM BEFORE NORMAL ONLINE USE OF THE SYSTEM IS ATTEMPTED THERE IS A SEPARATE RENALOG RM INSTRUCTION MANUAL P N 50090 859 A General Considerations and Cautions CAUTION MEDIVATORS S...

Страница 18: ...100 SERIES COMM PORT 2 RENATRON II 100 SERIES COMM PORT 5 RENATRON II 100 SERIES COMM PORT 3 RENATRON II 100 SERIES COMM PORT 6 RENATRON II 100 SERIES COMM PORT Port 6 Port 5 Port 4 SCANNER Port 3 Por...

Страница 19: ...rocessing Management System follow the calibration procedure outlined in the RENALOG RM User Guide PN 50090 859 C Remove the Dialyzer from the Extracorporeal Blood Circuit using standard facility prot...

Страница 20: ...screen of the RENALOG RM Program when the green light is illuminated on interface module scan the bar code label on the dialyzer to be reprocessed scan the bar code label on the RENATRON II 100 Serie...

Страница 21: ...e a supply of disinfected port caps Disinfection of the dialysate port caps blood port caps and the reprocessing connectors from the dialyzer can be achieved by one of the following ways a Place the c...

Страница 22: ...ble waterproof or permanent ink or other indelible marking systems to label the dialyzer is recommended when the RENATRON II 100 Series station is operated without RENALOG RM In the automaticmode thei...

Страница 23: ...bar code and the gun should be held 6 to 9 inches from the bar code 2 With a straight vertical motion move the scanner down over the label so that the red beam passes over the bar code The illustratio...

Страница 24: ...TION EXPOSING DIALYZERS TO CYCLIC TEMPERATURE DIFFERENCES DURING ANY PART OF THE REUSE PROCEDURE MAY RESULT IN INCREASING OR INITIATING PRESSURE BUILDUP IN THE DIALYZER DURING STORAGE IN THESE CONDITI...

Страница 25: ...ss ON switch SEL and will be displayed 4 Press and hold the SETUP switch S3 on the microprocessor board for 4 seconds until you hear the second chirp The PROGRAM STEP will display c1 and CAL will be d...

Страница 26: ...inue operating until it enters PROGRAM STEP 14 23 Press the OFF switch 24 Verify that the liquid level in the tank is at the 507 reference line upper tank scribe line 25 If the liquid level is above o...

Страница 27: ...TS DO NOT USE BLEACH C Formula 409 Service Cleaning Procedure The internal fluid pathways must be cleaned periodically typically once every two weeks or as required as outlined below RENATRONII100Seri...

Страница 28: ...ess the OFF switch and turn the water supply to the machine off Leave the machine overnight Wait at least 8 hours 14 Remove the uptake tube from the container of Formula 409 and make sure any excess F...

Страница 29: ...e hose and replaces it with Formula 409 9 Press ON select program 00 press the START SANITIZE switch Allow the machine to continue operating to the SANITIZE COMPLETE message in PROGRAM STEP 83 10 Pres...

Страница 30: ...t a sample from the calibration cell for a culture of water from the RENATRON station b After the sample has been collected press the RESET switch The RENATRON II 100 Series Station is now ready for c...

Страница 31: ...ATORS Renal Technical Support for the appropriate packing and shipping instructions Do not ship any part of the RENATRON II 100 Series system to MEDIVATORS without first notifying the Renal Technical...

Страница 32: ...Inspect Reprocessing Connections X X X X Inspect RENALIN 100 Uptake X X Tubing Assembly Inspect valve Assembly Large Small X V15 Inspect Hydraulic Compartment for X any signs of fluid leakage Test Jet...

Страница 33: ...ive Products or any parts it deems defective or ii a refund of the purchase price This will be customer s exclusive remedy for a covered defect In order to recover under the warranty the customer must...

Страница 34: ...Fuse Location Note Parts service and a service manual with drawings parts lists circuit diagrams are available on request from MEDIVATORS Renal Technical Support Explanation for Symbols Technical Supp...

Страница 35: ...ing Management Software 78398 192 RENALIN Residual Test Strips 78198 000 PERASSAY 500 Peracetic Acid Test Strips 78378 000 Dialyzer Dialysate Port Caps Red 78196 010 100 Ventable Dialyzer Dialysate Po...

Страница 36: ...729 Medivators BV Sourethweg 11 6422PC Heerlen The Netherlands Tel 31 45 5 471 471 Cantel Medical Asia Pacific Pte Ltd 1A International Business Park 05 01 Singapore 609933 Tel 65 6227 9698 Cantel Med...

Отзывы: