Webster 64
Page 26 of 32
Installation Manual
February 2024 • Rev. 1.1
Webster 64 controller reads
parameters in this file during boot up
sequence and configures the IP
address accordingly after which it will
write <USB INIT DONE> to
indicate that the initialization has
been done.
9.
Obtain all IP address information from IT personnel and modify the file
accordingly. Remove the line
<USB INIT DONE>
and save the file before removing
it from your computer.
10.
Repeat from step 1 to step 6 then proceed to step 11.
11.
Insert the flash drive into a USB port on a computer. When ready, launch
Windows Explorer or File Explorer. Access the USB drive and check if there is an
error file
present along with the file
.
12.
If no error file is present skip this
step and proceed to step 13.
Otherwise edit the error file and
review the errors indicated.
Correct the errors in the
MAPCFG.txt accordingly and save
it before removing it from the
computer. Repeat step 1 to 6 then
proceed to step 11.
See sample error
file.
13.
If no error file is present, it’s
recommended that the file MAPCFG.txt
be reviewed to ensure
that the line
<USB INIT DONE>
has been written by the Webster 64 controller
indicating that the IP configuration has been successfully saved and initialized.
Figure 22
Содержание Webster 64
Страница 1: ...Webster 64 Controller INSTALLATION MANUAL September 2023...
Страница 13: ...Webster 64 Page 13 of 32 Installation Manual February 2024 Rev 1 1 Figure 6 Non Supervised...
Страница 14: ...Webster 64 Page 14 of 32 Installation Manual February 2024 Rev 1 1 Figure 7 Supervised...
Страница 32: ...Webster 64 Page 32 of 32 Installation Manual February 2024 Rev 1 1...