xxxii
Check Sheet for the Periodic Inspection of the
Breaker
Copy this page for future use, and store it in a safe place near the machine to document your periodic
inspections of the breaker.
How to Inspect the Breaker Periodically
Follow the procedure described in “Periodic Inspection of the Breaker ,” on p. xxix, once or twice a month.
How to Fill in This Check Sheet
Fill in the date of inspection and the name of the inspector.
When the inspection is completed successfully, write a check mark under "OK."
If not, contact your local authorized Canon dealer. (Also, write a check mark under "NG" (No Good).)
Date of
Inspection
Date of
Inspection
Inspector
Inspector
Result
Result
OK
NG
OK
NG
■
■
Содержание iR3245
Страница 2: ......
Страница 3: ...iR3245 iR3235 iR3230 iR3225 Troubleshooting...
Страница 16: ...xiv Printing data scanned from an original followed by finishing options such as stapling Copying...
Страница 58: ...Main Power and Control Panel Power 1 24 1 Before You Start Using This Machine...
Страница 122: ...Consumables 2 64 2 Routine Maintenance...
Страница 256: ...Sample Reports 4 24 4 Appendix...
Страница 288: ...Index 4 56 4 Appendix...
Страница 292: ...System Management of the iR3245 iR3235 iR3230 iR3225 4 60 4 Appendix 2 Press System Settings...
Страница 298: ...System Management of the iR3245 iR3235 iR3230 iR3225 4 66 4 Appendix...
Страница 299: ......