Chapter 2
2-108
F-2-440
6) Remove the 2 bearings [1] on the rear side.
- 1 E ring each [2]
- 1 pulley each [3]
- 1 dowel pin each [4]
F-2-441
7) Remove the 2 bearings [1] on the front side to remove the multi path roll-
ers 1 [2] and 2 [3].
- 1 screw each [4]
- 1 grounding plate each [5]
- 1 sintered bushing each [6]
- 1 E ring each [7]
F-2-442
CAUTION: Point to note when attaching
Attach the timing belt [1] to cover the motor pulley [2], the 2 pulleys [3] and
the tensioner roller [4] uniformly.
[3]
[2]
[3]
[1]
[1]
[2]
[3]
[4]
[2]
[1]
[3]
[4]
CAUTION:
When replacing, be sure to apply grease around the inner diameter of the
bearing.
(Super lube grease)
CAUTION: Point to note when attaching
- Do not touch the 4 rubber rollers [1] with bare hand.
- Attach each roller with the slot [2] facing to the front side.
[2]
[3]
[1]
[7]
[6]
[5]
[4]
[1]
[1]
[2]
[1]
[1]
Содержание iPR C7010VP Series
Страница 2: ......
Страница 9: ......
Страница 13: ......
Страница 14: ...Chapter 1 Replacement Parts ...
Страница 15: ......
Страница 17: ......
Страница 41: ......
Страница 42: ...Chapter 2 Parts Replacement Procedure ...
Страница 43: ......
Страница 154: ...Chapter 2 2 109 ...
Страница 155: ......
Страница 156: ...Apr 5 2011 ...
Страница 157: ......