7. Maintenance

7.3 Surge Protection Device Maintenance

If surge protection device is damaged,

 

it will affect the safety of the inverter.

 

It is necessary to 

replace it with a new lightning protection module.

1. Disconnect the AC power.

2. Turn the DC switch to "OFF" position.

3. Wait for 15 minutes at least.

4. If DC surge protection device is damaged, remove the 6 screws on the inverter cover 

    

and open the cover. If AC surge protection device is damaged, remove the 4 screws on 

    

the wiring box cover and open the wiring box cover.

5. Press and hold the spring clip on the upper and lower sides of the damaged surge 

    protection module and remove it.(See Figure 7.3) 

    Insert the new lightning protection module in the correct position.

If the SPD fails or in malfunction. The inverter LCD will show “SPD-FAIL”, 

please replace the SPD module accordingly

Figure 7.3

.65.

.64.

8.1 Current Alarm 

8.1.1 Running messages

Running messages can be viewed on the screen including any current alarms.

8.2 Alarm History

8.2.1 Viewing alarm history

Refer to LCD Operation 6.6.8 for instructions on viewing Alarm History.

8.3 Error Messages

8. Troubleshooting

1).  Inverter serial number

2).  The inverter distributor/dealer (if available)

3).  Installation date

4).  The description of problem (e.g., the alarm message displayed on the screen and the 

      status of the screen status indicator lights. Other readings obtained from the 

Information sub menu (refer to Section 6.4) will also be helpful.)

5).  PV array configuration (e.g. number of panels, panel capacity, number of strings, etc.)

6).  Your contact details

8.3.1 Troubleshooting guide

Canadian Solar inverters are designed in accordance with international grid standards, safety 

standards and electromagnetic compatibility requirements. Before delivery to the customer, 

the inverter has been subjected to intensive testing to ensure its optimal operation and 

reliability.

In case of failure, the screen may display an alarm message, stop feeding energy into the 

grid or both. Typical failure descriptions and their corresponding alarm messages are listed in 

Table 9 on the following pages.

Please have the following information available when contacting technical support:

NOTE

The first step to clearing alarms as listed in Table 9, is to reset the inverter.  
To reset the inverter, turn off the inverter (refer to Section 6.2) and wait for 
five (5) minutes before restarting it (refer to Section 6.1). If the failure 
persists, please first contact your local distributor and then 

 

Canadian

 

Solar

Support Service.
If you need to contact 

 Support Service at

Canadian

 

solar

North, South & Central America Canadian Solar Inc.
Attn: Customer Service Department 3000 Oak Road, Suite 400
Walnut Creek, CA 94597
Tel: +1 855 315 8915
E-mail: [email protected]

Содержание CSI-125-T600GL02-U

Страница 1: ...gsu China 215129 P 1 519 837 1881 F 1 519 837 2550 Sales Inquiries Email info csisolar com Customer Support Email service ca csisolar com This manual is subject to change without prior noti cation Cop...

Страница 2: ...equipment has supplied The customer is fully liable for any modifications made to the system therefore any hardware or software modification manipulation or alteration not expressly approved by the ma...

Страница 3: ...reen 3 3 2 Rack mounting 3 4 Electrical Connections 17 18 3 4 1 Grounding 20 3 4 2 Connect PV side of inverter 23 3 4 3 Connect grid side of inverter 26 4 Communication Monitoring 6 5 1 Set Time 40 6...

Страница 4: ...emarks The inverter ships with all accessories in one carton When unpacking please verify all the parts listed below are included 3 4 Fastening screw 2 User manual 1 1 2 3 4 Manual Canadian Solar Thre...

Страница 5: ...en 0 to 100 non condensing Do not stack more than two 2 inverters high on a single pallet Do not stack more than 2 pallets high Keep the box es away from corrosive materials to avoid damage to the inv...

Страница 6: ...against the inverter 3 Installation To meet relevant codes and standards the Canadian Solar three phase inverter line is equipped with protective circuitry and controls Anti Islanding Protection Isla...

Страница 7: ...verter can be quite high 3 2 Product handling Figure 3 3 Handles used to move the inverter shown circled in red 3 1 2 4 Air circulation Do not install in small closed rooms where air cannot freely cir...

Страница 8: ...1 Refer to Figure 3 6 drill holes for mounting screws based on the hole diameter of bracket using a precision drill keeping the drill perpendicular to the wall Max depth is 90mm 2 Make sure the brack...

Страница 9: ...gle Please install the inverter vertically If the inverter cannot be mounted vertically it may be tilted backward to 15 degrees from vertical Vertical 15 Backward Figure 3 9 Correct installation Angle...

Страница 10: ...3 Connect the AC wires 4 Connect the DC wires The inverter is designed with a wiring box at the bottom Before the electrical connection it requires the cover for the bottom wiring box to be removed Ta...

Страница 11: ...ion 3 4 3 Connect the external grounding terminal 1 Prepare the grounding cable recommend to use the outdoor copper core cable The grounding wire should be at least half size of the hot wires To conne...

Страница 12: ...ol to crimp the terminal The crimped portion of the terminal must be insulated with heat shrinkable tube or insulating tape 4 Insert the cable through the nut sheath and DC terminal cover Connect the...

Страница 13: ...we recommend installing a device for protection against over current and leakage with the following characteristics noted in Table 3 2 3 4 2 1 DC connection high voltage danger notice CAUTION RISK OF...

Страница 14: ...erminal then use a hydraulic crimp tool to crimp the terminal The crimped portion of the terminal must be insulated with heat shrinkable tube or insulating tape 1 Strip the end of AC cable insulating...

Страница 15: ...net OUT Figure 4 3 Strip the insulation layer and connect to RJ45 plug Correspondence between the cables and the stitches of plug Pin 1 white and orange Pin 2 orange Pin 3 white and green Pin 4 blue P...

Страница 16: ...for onsite Ethernet communication commissioning If the router doesn t support automatic IP address use an Ethernet cable to connect the Ethernet module and your laptop Change the Laptop s IP address...

Страница 17: ...0 100 254 via web browser Enter username and password admin admin 3 Select Network from left menu 4 Select Use IP address below radio button Enter IP address subnet mask and default gateway Click Save...

Страница 18: ...inverter inverter damage or the inverter not operating at all 5 2 Changing the grid standard 5 2 1 Procedure to set the grid standard NOTE This operation is for service technicians only The inverter...

Страница 19: ...the strings if a leakage to ground has been detected Improper operation and damage to the inverter may result Once all DC tests have been completed close the fuse holders Measure leakage to ground to...

Страница 20: ...hat is within start up and operating ranges the inverter will turn on After turn on the inverter will check internal parameters sense and monitor AC voltage hertz rate and the stability of the supply...

Страница 21: ...he reactive power of the inverter App_Power Shows the apparent power of the inverter Work Mode Volt watt DRM NO 08 10 sec Work Mode Shows current working mode DRM NO Shows DRM Number VPV_Total 1000 0V...

Страница 22: ...3 NEXT ENT OK ESC 01 01 2019 16 37 Figure 6 3 Set Time Press the UP DOWN keys to set time and data Press the ENTER key to move from one digit to the next from left to right Press the ESC key to save t...

Страница 23: ...7 Daily Records The screen shows history of changing settings Only for maintance personel 6 6 3 Version The screen shows the model version of the inverter And the screen will show the software ver by...

Страница 24: ...V 415 1S V 415 0 16S 207 V 304 2S V 207 0 16S 60 5Hz F 62Hz 2S F 2Hz 6 0 16S 57Hz F 59 5Hz 2S 57Hz F 0 16S 600V Rated L L 6 7 Advanced Settings Technicians Only NOTE To access to this area is for full...

Страница 25: ...the previous menu 6 7 7 Special Settings This function is applicable by maintenance personnel only wrong operation will prevent the inverter from reaching maximum power 6 7 2 Grid ON OFF Grid ON Grid...

Страница 26: ...346 415V Default 381V Figure 6 22 Volt VAR Voltage1 303V Voltage2 340V 1 NULL Description Inverter is not under any working mode 6 Normal operation 6 Normal operation 6 7 8 STD Mode Settings 1 Working...

Страница 27: ...Fixed PF Description Inverter will output power with fixed power factor Setting Range 0 8 to 0 8 Default value is PF 1 5 Reac power Not Required Description Inverter will generate reactive power base...

Страница 28: ...nge 0 8 to 0 8 Default value is PF 1 6 Normal operation 6 Normal operation 6 7 8 1 2 With Rule21 Standard selected NOTE The other three working mode P1 V Watt P1 V Var and P1 V P V Q are NOT applicabl...

Страница 29: ...check the Volt watt and Volt var priority simply enter the working modes V Q V P indicates Volt Var First V P V Q indicates Volt Watt First 6 Normal operation 6 Normal operation 5 Reac power Not Requ...

Страница 30: ...scope 61 64Hz the default setting 62Hz Press the Enter key to select the mode or frequency Press Up Down to set Press ESC to save the settings Figure 6 36 Freq Watt characteristic f min f nom f start...

Страница 31: ...ximum power 6 7 8 5 Power Priority Figure 6 39 Power Priority This setting is used to set the priority between Active Power Control Watt and Reactive Power Control Var YES ENT NO ESC Select Var First...

Страница 32: ...not change this setting unless specifically instructed to This function is used to calibrate inverter output energy and voltage It will not impact the energy count for inverter with RGM Two sections...

Страница 33: ...ween PV and ground No need any control or settings The Anti PID module repairs the PID effect of the PV model at night When operating the inverter LCD screen displays PID repairing information and the...

Страница 34: ...age displayed on the screen and the status of the screen status indicator lights Other readings obtained from the Information sub menu refer to Section 6 4 will also be helpful 5 PV array configuratio...

Страница 35: ...Test DC switch OFF Check PV connections Check polarity Check voltage 860V Test DC Switch ON Check voltage 860V If DC voltage is 0 replace inverter Initializing Inverter stuck in this mode Inverter is...

Страница 36: ...itch ON Test AC line for THD Multiple inverters turn one off Impedance matching adjustment or box Internal damage Wire came loose in shipping INI PRO Initialization Protection Master and Slave DSP hav...

Страница 37: ...Ue 1500V DC In 315A Icu 20KA Type II In 20KA Imax 40KA Up 5 0KV Uc 1500V LM PVSZ CV G20 Manufactured by LONGMAX Monitor Bus voltage current of per string power status of SPD output DC MCCB status on...

Страница 38: ...ompleted Record V AC in Notes 10 Grounding cable Good Poor INSTALLATION Check inverter condition after unpacking Install inverter mounting bracket according to installation instructions in user manual...

Страница 39: ...cable to the communication port 1 Switch the grid supply main Switch AC ON rst 2 Switch the DC switch ON If the voltages of PV arrays are higher than start up voltage the inverter will turn on The re...

Страница 40: ...eted Record address in Notes 7 Machine version For maintenance and reference please record the irmware revisions if applicable Completed Record with serial numbers 8 Operating parameter Record operati...

Страница 41: ...ting tilt Output power Input DC voltage Insulation limit K PV start up voltage Grid V Max V Min Frequency Max Min Reactive compensation PF Coniguration MPPT Individual MPPT Parallel Monitoring RS485 E...

Страница 42: ...to inverter site selection and installation 3 PHASE STRING INVERTERS KTL SERIES CSIF ST 016 A 0 INSTALLER S NAME INSTALLER S SIGNATURE COMPANY DATE Inverter serial numbers 1 2 3 4 5 6 7 8 9 10 11 12 1...

Отзывы: