www.camplux.com
20
Visit Us: Camplux.com
3330-A Marathon Ct Charleston, SC 29418
(844) 538-7475
Pressure Testing The Gas Supply System
WARNING:
Install a gas pressure regulator, in the gas supply line, which does
not exceed the maximum supply pressure. DO NOT use an industrial type gas
regulator.
To Hot Water
Faucet(s)
Drain Valve
Tapping Screw
Foil
Power
Supply
Cord
Manual Gas
Supply Line
Shut-Off Valve
Manual Gas
Shut-Off Valve
(Supplied)
Sediment Trap
Union
Cap
Cold Water Supply
Shut-Off Valve
To Suitable
*Note: A fexible drain tube can be used
Vent Pipe
Service
Valve
Union
Relief Valve
Installing The Water Heater
NOTICE:
The National Fuel Gas Code (NFGC) mandates a manual gas shut off
valve: See (NFGC) for complete instructions. Local codes or plumbing authority
requirements may vary from the instructions or diagrams provided and take
precedent over these instructions.