Page
12
- Manual
FA01626-EN
- 02/2023 - © C
AME S.p.A. - The contents of this manual may be changed at any time and without notice. - T
ranslation of the o
riginal instructions
1
Remove the microswitch support plate, mechanical stops and boom anchoring plate. Loosen the balance spring and unhook it from the anchoring bracket.
2
Turn the gearmotor arm 90°.
- Turn it anticlockwise to change the opening from left to right.
- Turn it clockwise to change the opening from right to left.
3
Lock the gearmotor and fit the mechanical stops on the opposite end. Fit the boom anchoring plate again using threadlocker on the screws. Fit the microswitch support
plate and reattach the spring.
Invert the cables connecting the limit microswitches (FC - FA) and the motor phases (M - N) on the electrical panel.
With the barrier installed, rebalance the boom and redetermine the mechanical limit switches.
90°
Boom installation
Install the boom-attachment cover on the anchoring plate with one screw only.
Leave the screw slightly loose to make it easier to fit the boom later.
First install the LED strip (where applicable), ONLY THEN fix the flange and the intermediate plate.