!
19!
!
Proprietary*Information:*Not*for*use*or*disclosure*except*by*written*agreement*with*Calix.*
©!Calix.!All!Rights!Reserved.!
PrepaYou+Begin+
Complete the following preparations before you begin the installation process.
Site!requirements!
Before starting the installation, verify that the following conditions are met:
!
!
All materials are onsite and inventoried
!
!
An equipment rack and a grounding system are available
!
!
Thirteen rack units (13 RU) of mounting space on a standard 19- or 23-inch equipment
rack with minimum clearance for all devices
!
!
The thermal budget is accounted for and approved
!
!
Access to a -48 VDC power source with fuse-protected distribution is available
!
!
The installation site has restricted access
!
!
Cable lengths and wire gauges are adequate for the services provided
!
!
Assignments for power, transport, services, alarms, timing, and other interfaces have
been defined
Содержание E7-20
Страница 1: ... Calix E7 20 Installation Guide February 2013 220 00418 Rev 13 ...
Страница 2: ... ...