16!
!!
!
Proprietary*Information:*Not*for*use*or*disclosure*except*by*written*agreement*with*Calix.*
©!Calix.!All!Rights!Reserved.!
InstaGui
Review the following guidelines before starting installation activities.
General!guidelines!
Follow these general guidelines and practices:
!
!
Read this document completely before starting any installation activities.
!
!
Only qualified, professional personnel should perform the procedures described in this
document.
!
!
Follow standard safety precautions when performing installation and maintenance tasks.
!
!
Always wear standard safety gear when performing installation and maintenance tasks
(hardhats/safety headgear, reflective vest, eye protection, insulated gloves).
!
!
For safety, keep bystanders and other unauthorized personnel away from work
operations at all times.
!
!
The E7-20 is to only be deployed in a temperature-controlled central office environment.
!
!
The E7-20 installation kit includes power cables that are 10 feet in length and ground
cables that are 12 feet in length. If you cannot locate the E7-20 within these lengths of
the power/ground source, you must supply your own cables.
Содержание E7-20
Страница 1: ... Calix E7 20 Installation Guide February 2013 220 00418 Rev 13 ...
Страница 2: ... ...