Lead sealing procedure
Meter with threaded connections
9
A)
Insert the steel thread into the dedicated hole on the volume meter caps and twist it.
B)
Wind the thread as illustrated in the figure so that, once lead sealing is complete, the cap cannot be unscrewed without breaking the seal or
the thread.
C)
Twist the thread and insert the plumb bob.
D)
Pass the thread through the hole on the probe and the pocket and twist it;
E)
Wind the thread as illustrated in the figure so that, once lead sealing is complete, the cap cannot be unscrewed without breaking the seal or
the thread;
F)
Twist the thread and insert the plumb bob;
G)
Repeat steps D, E, F for the other temperature probe.
H)
Pass the thread through one of the
dedicated holes on the sides of the heat
meter calculation unit, twist it, then finally
insert the plumb bob.
I)
Apply a cast to the plumb bobs, as
shown in green in the figure on the right.