EPIM SPECIFICATIONS
Page A-20
A.3.5
Connecting an AUI Cable to an EPIM-X
Caution: The signal quality error (SQE) switch remains in the OFF
position for most network connections. However, some Data Terminal
Equipment (DTE) requires SQE. Refer to your DTE manual for SQE
requirement information.
To connect an EPIM-X to a device not requiring SQE:
1.
Check that the SQE LED on the EPIM-X is off. If the SQE LED is
on, check the position of the SQE switch.
Note: If the SQE light remains on, even though the SQE switch is
in the OFF position, contact Cabletron Technical Support.
2.
Attach one end of an AUI cable, no longer than 50 meters in length,
to the port located on the EPIM-X (Figure A-10) and the other end
to the intended node.
Figure A-10. The EPIM-X
OFF Position
(Toward Front
of EPIM)
ON Position
(Toward Back
of EPIM)
OFF
ON