Burnham SM-6 Скачать руководство пользователя страница 25

25

Warning

:  

This product contains refractory ceramic fi bers (RCF).  RCF has been classifi ed 
as a possible human carcinogen.  After this product is fi red, RCF may, when 
exposed to extremely high temperature (>1800F), change into a known human 
carcinogen.  When disturbed as a result of servicing or repair, RCF becomes 
airborne and, if inhaled, may be hazardous to your health.

AVOID Breathing Fiber Particulates and Dust

Precautionary Measures

:  

Do not remove or replace previously fi red RCF (combustion chamber insulation, 
target walls, canopy gasket, fl ue cover gasket, etc.) or attempt any service or 
repair work involving RCF without wearing the following protective gear:

1.   A National Institute for Occupational Safety and Health (NIOSH) 

approved respirator

2.   Long sleeved, loose fi tting clothing

3.   Gloves

4.   Eye Protection

• 

Take steps to assure adequate ventilation.

• 

Wash all exposed body areas gently with soap and water after contact.

• 

Wash work clothes separately from other laundry and rinse washing 
machine after use to avoid contaminating other clothes. 

• 

Discard used RCF components by sealing in an air tight plastic bag.

First Aid Procedures

:

• 

If contact with eyes:  Flush with water for at least 15 minutes.  Seek 
immediate medical attention if irritation persists.

• 

If contact with skin:  Wash affected area gently with soap and water.  
Seek immediate medical attention if irritation persists.

• 

If breathing diffi culty develops:  Leave the area and move to a 
location with clean fresh air.  Seek immediate medical attention if 
breathing diffi culties persist.

• 

Ingestion:  Do not induce vomiting.  Drink plenty of water.  Seek 
immediate medical attention.

n

o

i

t

a

m

r

o

f

n

I

y

t

e

f

a

S

t

c

u

d

o

r

P

t

n

a

t

r

o

p

m

I

t

c

u

d

o

r

P

r

e

b

i

F

c

i

m

a

r

e

C

y

r

o

t

c

a

r

f

e

R

Содержание SM-6

Страница 1: ...l i o B e d i v o r p r e l i o b r e b m u N l e d o M r e l i o B r e b m u N l a i r e S r e l i o B e t a D n o i t a l l a t s n I _ _ _ _ _ _ _ M S _ _ _ _ _ _ _ 6 r o t c a r t n o C g n i t a...

Страница 2: ...of the installing contractor to see that all controls are operating properly when the installation is completed Service on this boiler should be undertaken only by trained and skilled personnel Post...

Страница 3: ...NLY Figure 1 SPACEMASTER WALL MOUNTED GAS BOILER DIMENSIONAL DATA I General Installation Requirements 4 II Installation Instructions 7 III Operating Instructions 13 IV Service 23 V Repair Parts 26 VI...

Страница 4: ...ers Therefore adequate supports must be added between existing studding b A suggested mounting height where practical is five feet six inches from floor to center line of intake air duct opening See F...

Страница 5: ...r area which has adequate air supply shall be provided One opening should be near the floor and the other near the ceiling Each shall have a free area of not less than one 1 square inch for each thous...

Страница 6: ...0 0 1 0 5 3 0 1 5 9 1 5 2 1 4 4 3 9 5 7 1 0 5 1 0 4 4 8 0 6 1 5 7 1 7 3 7 7 5 4 1 r o f I I d n a I s e l b a T h t i w d e s u e b o t s r e i l p i t l u M 0 6 0 n a h T r e h t O y t i v a r G c i...

Страница 7: ...oiler mounting wall bracket on wall using a 24 level across top corners level wall bracket and secure to wall with suitable fasteners h Attach lower R S jacket mounting bracket to right side of boiler...

Страница 8: ...e gasket is in place and flat against back plate Attach duct with four 4 20 brass hex nuts lockwashers and flat washers 3 INSTALLING EXTERIOR TELESCOPING INTAKE AIR DUCT See Figures 4 and 5 a Position...

Страница 9: ...ng stainless steel machine screws provided 5 DO NOT REPLACE ENCLOSURE COVER until boiler piping is completed and system is filled vented and checked for water leaks 6 CONNECT SUPPLY AND RETURN PIPING...

Страница 10: ...y valve will raise the system temperature while opening the by pass valve will lower the system supply temperature If it is required to perform a long term pressure test of the hydronic system the boi...

Страница 11: ...11 Figure 7 RECOMMENDED PIPING FOR COMBINATION HEATING COOLING REFRIGERATION SYSTEMS Figure 9 EXPLODED JACKET ASSEMBLY...

Страница 12: ...be influenced by drafts hot or cold water pipes lighting fixtures television rays of the sun or near a fireplace Keep large furniture away from thermostat so there will be free movement of room air ar...

Страница 13: ...s have been purged but always have one zone open At completion open all zone valves 10 Close drain valve on purge fitting 11 Continue filling the system until the pressure gauge reads 12 psi Close fil...

Страница 14: ...14 NOTE YOUR BOILER IS EQUIPPED WITH A HONEYWELL VR8204 OR VR8304 GAS VALVE PLEASE FOLLOW THESE OPERATING INSTRUCTIONS...

Страница 15: ...15 Figure 11 SCHEMATIC WIRING DIAGRAM...

Страница 16: ...16 Figure 12 LADDER WIRING DIAGRAM...

Страница 17: ...regulator on the gas valve will permit full flow through the main gas valve high fire Should a loss of flame occur the main valve closes and the spark reoccurs within 0 8 second The ignition module h...

Страница 18: ...nstalled in the 1 8 pipe tapping in the gas valve boiler off By installing gas valve up stream of manometer gas pressure can be introduced gradually without shutoff valve surge of pressure when boiler...

Страница 19: ...19...

Страница 20: ...20...

Страница 21: ...21...

Страница 22: ...lead from electrical junction block If burners are not shut down by module determine cause of malfunction Replace module or gas valve if necessary 10 MAIN BURNER FLAMES should have a clearly defined...

Страница 23: ...r and jacket front panel If the flue passageways need cleaning remove burners as described in paragraph 4 below Using long handle wire or bristle flue brush and vacuum brush flueways thoroughly from t...

Страница 24: ...attention to solder joints on bellows and float when this type of control is used Check float for evidence of collapse and check mercury bulb where applicable for mercury separation or discoloration P...

Страница 25: ...thing 3 Gloves 4 Eye Protection Take steps to assure adequate ventilation Wash all exposed body areas gently with soap and water after contact Wash work clothes separately from other laundry and rinse...

Страница 26: ...5 5 0 6 1 1 8 n a F s e d u l c n I y l b m e s s A t n e m e c a l p e R n a F t f a r D d e c u d n I s t e k s a G t e l t u O n a F 2 o w t d n a t e k s a G t e l n I n a F t e k s a G t e l t u...

Страница 27: ...either the supply or return piping The minimum safe water level of a water boiler is at the uppermost top of the boiler that is it must be full of water to operate safely What Kind Typically in resid...

Страница 28: ...HTS AND YOU MAY ALSO HAVE OTHER RIGHTS WHICH VARY FROM STATE TO STATE Limited Warranty FOR RESIDENTIAL CAST IRON WATER BOILERS 03 03 Subject to the terms and conditions set forth below U S Boiler Co I...

Отзывы: