Burnham SM-6 Скачать руководство пользователя страница 23

23

IV.  Service

GENERAL — Inspection should be conducted 
annually.  Service as frequently as specifi ed in 
paragraphs below.  While service or maintenance is 
being done, Electrical Power and all Gas Supply to the 
Boiler must be “off.”

N

O

I

T

U

A

C

n

e

h

w

n

o

i

t

c

e

n

n

o

c

s

i

d

o

t

r

o

i

r

p

s

e

r

i

w

l

l

a

l

e

b

a

L

e

s

u

a

c

n

a

c

s

r

o

r

r

e

g

n

i

r

i

W

.

s

l

o

r

t

n

o

c

g

n

i

c

i

v

r

e

s

y

f

i

r

e

V

.

n

o

i

t

a

r

e

p

o

s

u

o

r

e

g

n

a

d

d

n

a

r

e

p

o

r

p

m

i

.

g

n

i

c

i

v

r

e

s

r

e

t

f

a

n

o

i

t

a

r

e

p

o

r

e

p

o

r

p

2

 VENT 

SYSTEM 

— 

Vent 

system (see Figure 4 for 

typical installation) should be checked annually for:

a. Obstructions

b.  Accumulations of soot

c.  Deterioration of vent pipe or vent accessories due to 

condensation or other reasons

d.  Proper attachment of vent cap and sealant around 

wall penetration

e.  Remove vent cap and clean accumulations of 

soot and dirt with wire brush and vacuum.  See 
Figure 16.  Remove any obstructions.  Replace all 
deteriorated parts.

3

 

CLEANING BOILER FLUES (See Figure 16).

      Flue passageways in the boiler sections should be 

checked annually for any blockage or accumulation of 
soot.  To obtain access to fl ueways:

a.  Remove jacket front panel.

b.  Remove sheet metal screws securing combustion 

area enclosure cover and remove cover.  Exercise 
care when removing to prevent damage to enclosure 
gasket.

c.  Remove fan assembly after disconnecting electrical 

leads and vent tube.  Care should be exercised to 
avoid damage to gaskets.

d.  Remove four (4) bolts securing canopy and remove 

canopy — fl ueways are now exposed.

 Using 

fl ashlight, examine all fl ue passageways.  

If passageways are free of soot and obstruction, 
replace canopy, secure and seal using kit available 
from Burnham distributors.

e.  Replace fan, connect vent tube and electrical wiring.

f.  Reinstall and secure enclosure cover and jacket front 

panel.

 If 

the 

fl ue passageways need cleaning, remove 

burners as described in paragraph 4 below.  Using 
long handle wire or bristle fl ue brush and vacuum, 

brush fl ueways thoroughly from top of boilers as 
illustrated in Figure 16.  Replace canopy and seal.

4

 

  BURNERS AND FIREBOX SHOULD BE 

CLEANED ANNUALLY

a.  Remove jacket front panel.

b.  Remove sheet metal screws securing enclosure 

cover and remove cover exercising care with gasket.

c.  Remove TCO leads from TCO and remove burner 

access panel.

d.  Brush top of burner with a soft bristle brush and 

vacuum burner, see Figure 16.  Check orifi ce to see 
that drilled passageway is free of lint and dirt.

e.  Vacuum tips of pilot burner.

f. Clean 

fi rebox by vacuuming.  Exercise care not to 

disturb insulation inside base.

5

 

REMOVAL OF BURNER ASSEMBLY

a.  Disconnect pilot tubing coupling, ignition cable and 

ground wire from pilot assembly.

b.  Disconnect gas valve at union between valve and 

bulkhead penetration.

c.  Remove two fasteners attaching burner to bulkhead 

and single fastener for burner end support.

d.  Grasp burner, tilt upward and remove from unit.

e. INSTALL BURNER by reversing procedure used 

to remove.

6

 

REMOVAL OR REPLACEMENT OF PILOT 
ASSEMBLY OR PILOT ASSEMBLY PARTS

a.  If pilot assembly, sensor or pilot orifi ce need 

replacement, remove jacket front panel, enclosure 
cover and burner access panel using procedure 
described in paragraph 4 above.

b.  Disconnect pilot tubing, ground wire and ignition 

sensor cable.

c.  Remove two machine screws holding pilot burner to 

pilot bracket.

d.  Reinstall pilot burner by reversing above procedure.

e.  Check pilot and main burner fl ames, refer to Figures 

14 & 15.

7

 

CHECK MAIN BURNER AND PILOT FLAMES, 
refer to Section III, paragraphs 6 and 10.

8

 

CHECK ALL CONTROLS ANNUALLY, see 
procedure in Section III, paragraphs 7, 8, 9, 11 and 12.

 

MAINTENANCE OF LOW WATER CUTOFF 
— During the heating season, if an external fl oat type 
low water cutoff is on the boiler, the blow off valve 
should be opened once a month (use greater frequency 

Содержание SM-6

Страница 1: ...l i o B e d i v o r p r e l i o b r e b m u N l e d o M r e l i o B r e b m u N l a i r e S r e l i o B e t a D n o i t a l l a t s n I _ _ _ _ _ _ _ M S _ _ _ _ _ _ _ 6 r o t c a r t n o C g n i t a...

Страница 2: ...of the installing contractor to see that all controls are operating properly when the installation is completed Service on this boiler should be undertaken only by trained and skilled personnel Post...

Страница 3: ...NLY Figure 1 SPACEMASTER WALL MOUNTED GAS BOILER DIMENSIONAL DATA I General Installation Requirements 4 II Installation Instructions 7 III Operating Instructions 13 IV Service 23 V Repair Parts 26 VI...

Страница 4: ...ers Therefore adequate supports must be added between existing studding b A suggested mounting height where practical is five feet six inches from floor to center line of intake air duct opening See F...

Страница 5: ...r area which has adequate air supply shall be provided One opening should be near the floor and the other near the ceiling Each shall have a free area of not less than one 1 square inch for each thous...

Страница 6: ...0 0 1 0 5 3 0 1 5 9 1 5 2 1 4 4 3 9 5 7 1 0 5 1 0 4 4 8 0 6 1 5 7 1 7 3 7 7 5 4 1 r o f I I d n a I s e l b a T h t i w d e s u e b o t s r e i l p i t l u M 0 6 0 n a h T r e h t O y t i v a r G c i...

Страница 7: ...oiler mounting wall bracket on wall using a 24 level across top corners level wall bracket and secure to wall with suitable fasteners h Attach lower R S jacket mounting bracket to right side of boiler...

Страница 8: ...e gasket is in place and flat against back plate Attach duct with four 4 20 brass hex nuts lockwashers and flat washers 3 INSTALLING EXTERIOR TELESCOPING INTAKE AIR DUCT See Figures 4 and 5 a Position...

Страница 9: ...ng stainless steel machine screws provided 5 DO NOT REPLACE ENCLOSURE COVER until boiler piping is completed and system is filled vented and checked for water leaks 6 CONNECT SUPPLY AND RETURN PIPING...

Страница 10: ...y valve will raise the system temperature while opening the by pass valve will lower the system supply temperature If it is required to perform a long term pressure test of the hydronic system the boi...

Страница 11: ...11 Figure 7 RECOMMENDED PIPING FOR COMBINATION HEATING COOLING REFRIGERATION SYSTEMS Figure 9 EXPLODED JACKET ASSEMBLY...

Страница 12: ...be influenced by drafts hot or cold water pipes lighting fixtures television rays of the sun or near a fireplace Keep large furniture away from thermostat so there will be free movement of room air ar...

Страница 13: ...s have been purged but always have one zone open At completion open all zone valves 10 Close drain valve on purge fitting 11 Continue filling the system until the pressure gauge reads 12 psi Close fil...

Страница 14: ...14 NOTE YOUR BOILER IS EQUIPPED WITH A HONEYWELL VR8204 OR VR8304 GAS VALVE PLEASE FOLLOW THESE OPERATING INSTRUCTIONS...

Страница 15: ...15 Figure 11 SCHEMATIC WIRING DIAGRAM...

Страница 16: ...16 Figure 12 LADDER WIRING DIAGRAM...

Страница 17: ...regulator on the gas valve will permit full flow through the main gas valve high fire Should a loss of flame occur the main valve closes and the spark reoccurs within 0 8 second The ignition module h...

Страница 18: ...nstalled in the 1 8 pipe tapping in the gas valve boiler off By installing gas valve up stream of manometer gas pressure can be introduced gradually without shutoff valve surge of pressure when boiler...

Страница 19: ...19...

Страница 20: ...20...

Страница 21: ...21...

Страница 22: ...lead from electrical junction block If burners are not shut down by module determine cause of malfunction Replace module or gas valve if necessary 10 MAIN BURNER FLAMES should have a clearly defined...

Страница 23: ...r and jacket front panel If the flue passageways need cleaning remove burners as described in paragraph 4 below Using long handle wire or bristle flue brush and vacuum brush flueways thoroughly from t...

Страница 24: ...attention to solder joints on bellows and float when this type of control is used Check float for evidence of collapse and check mercury bulb where applicable for mercury separation or discoloration P...

Страница 25: ...thing 3 Gloves 4 Eye Protection Take steps to assure adequate ventilation Wash all exposed body areas gently with soap and water after contact Wash work clothes separately from other laundry and rinse...

Страница 26: ...5 5 0 6 1 1 8 n a F s e d u l c n I y l b m e s s A t n e m e c a l p e R n a F t f a r D d e c u d n I s t e k s a G t e l t u O n a F 2 o w t d n a t e k s a G t e l n I n a F t e k s a G t e l t u...

Страница 27: ...either the supply or return piping The minimum safe water level of a water boiler is at the uppermost top of the boiler that is it must be full of water to operate safely What Kind Typically in resid...

Страница 28: ...HTS AND YOU MAY ALSO HAVE OTHER RIGHTS WHICH VARY FROM STATE TO STATE Limited Warranty FOR RESIDENTIAL CAST IRON WATER BOILERS 03 03 Subject to the terms and conditions set forth below U S Boiler Co I...

Отзывы: