SEQUENCE OF OPERATION

1.  When the thermostat calls for heat, relay coil (1M) 

is energized closing two sets of NO contacts.  One 
set (1M2) energizes the 24 volt limit circuit and the 
other set (1M1) completes the 120 volt circulator 
circuit.

2.  With the thermal cutout switch (on the burner 

access panel), the high limit switch, and the suction  
pressure switch in their normally closed positions, 
the fan relay coil (2M) is energized closing two sets 
of NO contacts.  One set (2M1) completes the 120 
volt fan circuit and the other set (2M2) energizes the 
24V suction pressure “check” circuit.

3.  With the fan operating, the suction pressure switch 

closes its NO contacts.  The “check” circuit contacts 
(2M2) keep power on the fan relay (2M) during the 
heating cycle.

4.  When the suction pressure switch proves fan 

operation the ignition module is energized, 
beginning a 30-50 second prepurge.  During 
prepurge the module performs a safe-start check 
that tests the internal components of the module for 
a fl ame simulating condition.  If a fl ame simulating 
condition is present in the module, the heating 
system will not start.

5.  After prepurge, the module energizes the pilot gas 

valve operator.  The pilot gas valve opens, allowing 
gas to fl ow to the pilot burner.  At the same time, the 
electronic spark generator in the module generates a 
spark at the ignitor-sensor to light the pilot.

6.  If the pilot does not light within 90 seconds, or the 

pilot fl ame current is not at least 1.0 milliamps and 
steady, the module will not energize the main gas 
valve and the main burner will not light.  Then the 
module goes into safety lockout, de-energizing the 
pilot gas valve operator causing the pilot gas valve 
to close.  Five to six minutes after shutdown, the 
Ignition Module restarts the ignition sequence.

7.  When the sensor senses pilot fl ame during the 90 

second trial for ignition the module will shut off the 
spark generator, reset the safety lockout timer, and 
energize the main gas valve operator.  The main gas 
valve opens allowing gas to fl ow to the main burners 
where it is ignited by the pilot burner.  Since the 
main gas valve is a step-opening valve, a limited 
amount of gas will be admitted to main burners 
for ignition (low fi re).  After a short time interval, 
the regulator on the gas valve will permit full fl ow 
through the main gas valve (high fi re).

 

Should a loss of fl ame occur, the main valve closes 
and the spark reoccurs within 0.8 second.  The 
ignition module has an internal 100% lockout 
function to completely shutdown the system should 
the pilot gas fail to ignite with approx. 90 seconds.  
Five to six minutes after shutdown, the Ignition 
Module restarts the ignition sequence.  The ignition 
trial, shutdown, and wait sequence continues until 
either the pilot lights or the Thermostat is set below 
room temperature (to end the call for heat).  The 
ignition sequence can be reset by setting down the 
Thermostat for one minute.

8.  Burners, circulator and fan will continue to operate 

until the thermostat is satisfi ed.

9.  If the high limit setting is reached before the 

thermostat is satisfi ed, the switch in the high limit 
will open to de-energize the ignition module and 
fan relay coil (2M), causing the gas valves to close 
and the fan to stop.  (The circulator will continue 
to operate as long as the thermostat is calling for 
heat).  When the boiler water temperature drops to 
a point where the high limit switch closes, the fan 
will restart (via 2M) and the ignition module will be 
energized to repeat the sequence in Steps 4 through 
7 above.

10. If for any reason (such as fl ame roll out into the 

vestibule) the thermal cutoff switch located on the 
burner access panel is subjected to temperatures 
above its setting the TCO switch will open to 
de-energize the ignition module and fan relay coil 
(2M), causing the gas valves to close and the fan to 
stop. (The circulator will continue to operate as long 
as the thermostat is calling for heat).  Since the TCO 
switch is a one-time fusible link, the reason for over-
heating must be determined and the switch replaced 
in order for the boiler to function again.

11. In the event the fan is inoperative or fails to provide 

suffi cient air fl ow, the suction pressure switch 
connected at the inlet of the fan will not activate, the 
NO contacts will not close, the ignition module will 
not be energized, and hence the gas valves cannot be 
opened.

12. If the contacts in the suction pressure switch were 

to weld together during the heating cycle (COM to 
NO), the ignition module could not be energized 
on the next call for heat due to the fact the fan relay 
coil (2M) could not be energized through either the 
suction pressure switch or the now open “check 
circuit” contacts.

Содержание SM-6

Страница 1: ...l i o B e d i v o r p r e l i o b r e b m u N l e d o M r e l i o B r e b m u N l a i r e S r e l i o B e t a D n o i t a l l a t s n I _ _ _ _ _ _ _ M S _ _ _ _ _ _ _ 6 r o t c a r t n o C g n i t a...

Страница 2: ...of the installing contractor to see that all controls are operating properly when the installation is completed Service on this boiler should be undertaken only by trained and skilled personnel Post...

Страница 3: ...NLY Figure 1 SPACEMASTER WALL MOUNTED GAS BOILER DIMENSIONAL DATA I General Installation Requirements 4 II Installation Instructions 7 III Operating Instructions 13 IV Service 23 V Repair Parts 26 VI...

Страница 4: ...ers Therefore adequate supports must be added between existing studding b A suggested mounting height where practical is five feet six inches from floor to center line of intake air duct opening See F...

Страница 5: ...r area which has adequate air supply shall be provided One opening should be near the floor and the other near the ceiling Each shall have a free area of not less than one 1 square inch for each thous...

Страница 6: ...0 0 1 0 5 3 0 1 5 9 1 5 2 1 4 4 3 9 5 7 1 0 5 1 0 4 4 8 0 6 1 5 7 1 7 3 7 7 5 4 1 r o f I I d n a I s e l b a T h t i w d e s u e b o t s r e i l p i t l u M 0 6 0 n a h T r e h t O y t i v a r G c i...

Страница 7: ...oiler mounting wall bracket on wall using a 24 level across top corners level wall bracket and secure to wall with suitable fasteners h Attach lower R S jacket mounting bracket to right side of boiler...

Страница 8: ...e gasket is in place and flat against back plate Attach duct with four 4 20 brass hex nuts lockwashers and flat washers 3 INSTALLING EXTERIOR TELESCOPING INTAKE AIR DUCT See Figures 4 and 5 a Position...

Страница 9: ...ng stainless steel machine screws provided 5 DO NOT REPLACE ENCLOSURE COVER until boiler piping is completed and system is filled vented and checked for water leaks 6 CONNECT SUPPLY AND RETURN PIPING...

Страница 10: ...y valve will raise the system temperature while opening the by pass valve will lower the system supply temperature If it is required to perform a long term pressure test of the hydronic system the boi...

Страница 11: ...11 Figure 7 RECOMMENDED PIPING FOR COMBINATION HEATING COOLING REFRIGERATION SYSTEMS Figure 9 EXPLODED JACKET ASSEMBLY...

Страница 12: ...be influenced by drafts hot or cold water pipes lighting fixtures television rays of the sun or near a fireplace Keep large furniture away from thermostat so there will be free movement of room air ar...

Страница 13: ...s have been purged but always have one zone open At completion open all zone valves 10 Close drain valve on purge fitting 11 Continue filling the system until the pressure gauge reads 12 psi Close fil...

Страница 14: ...14 NOTE YOUR BOILER IS EQUIPPED WITH A HONEYWELL VR8204 OR VR8304 GAS VALVE PLEASE FOLLOW THESE OPERATING INSTRUCTIONS...

Страница 15: ...15 Figure 11 SCHEMATIC WIRING DIAGRAM...

Страница 16: ...16 Figure 12 LADDER WIRING DIAGRAM...

Страница 17: ...regulator on the gas valve will permit full flow through the main gas valve high fire Should a loss of flame occur the main valve closes and the spark reoccurs within 0 8 second The ignition module h...

Страница 18: ...nstalled in the 1 8 pipe tapping in the gas valve boiler off By installing gas valve up stream of manometer gas pressure can be introduced gradually without shutoff valve surge of pressure when boiler...

Страница 19: ...19...

Страница 20: ...20...

Страница 21: ...21...

Страница 22: ...lead from electrical junction block If burners are not shut down by module determine cause of malfunction Replace module or gas valve if necessary 10 MAIN BURNER FLAMES should have a clearly defined...

Страница 23: ...r and jacket front panel If the flue passageways need cleaning remove burners as described in paragraph 4 below Using long handle wire or bristle flue brush and vacuum brush flueways thoroughly from t...

Страница 24: ...attention to solder joints on bellows and float when this type of control is used Check float for evidence of collapse and check mercury bulb where applicable for mercury separation or discoloration P...

Страница 25: ...thing 3 Gloves 4 Eye Protection Take steps to assure adequate ventilation Wash all exposed body areas gently with soap and water after contact Wash work clothes separately from other laundry and rinse...

Страница 26: ...5 5 0 6 1 1 8 n a F s e d u l c n I y l b m e s s A t n e m e c a l p e R n a F t f a r D d e c u d n I s t e k s a G t e l t u O n a F 2 o w t d n a t e k s a G t e l n I n a F t e k s a G t e l t u...

Страница 27: ...either the supply or return piping The minimum safe water level of a water boiler is at the uppermost top of the boiler that is it must be full of water to operate safely What Kind Typically in resid...

Страница 28: ...HTS AND YOU MAY ALSO HAVE OTHER RIGHTS WHICH VARY FROM STATE TO STATE Limited Warranty FOR RESIDENTIAL CAST IRON WATER BOILERS 03 03 Subject to the terms and conditions set forth below U S Boiler Co I...

Отзывы: