8
I. Pre-Installation
Carefully read all instructions before installing
boiler. Failure to follow all instructions in proper
order can cause personal injury or death.
A
.
Inspect shipment
carefully for any signs of damage.
All equipment is carefully manufactured, inspected
and packed. Our responsibility ceases upon delivery
of boiler to carrier in good condition. Any claim
for damage or shortage in shipment must be filed
immediately against carrier by consignee. No claims
for variances or shortages will be allowed by Boiler
Manufacturer, unless presented within sixty (60) days
after receipt of equipment.
B.
Installation must conform
to the requirements of
the authority having jurisdiction. In the absence of
such requirements, installation must conform to the
National Fuel Gas Code
, NFPA 54/ANSI Z223.1 and/or
CAN/CSA B149.1 Installation Codes. Where required
by the authority having jurisdiction, the installation
must conform to the
Standard for Controls and Safety
Devices for Automatically Fired Boilers
, ANSI/ASME
No CSD-1.
C.
Provide clearance between combustible material
and
boiler jacket (following clearances are minimums):
1. USA, 805H-807HE: listed for Alcove installation
a. Front: 18”
b. Top: 36”
c. Draft hood, rear, sides and flue connector: 6”
Appliance is design certified for installation on
noncombustible flooring only. For installation
on combustible flooring only when installed on
special base listed in Table 2. Boiler must not be
installed on carpeting. When boiler is installed on
concrete which is over a material that is subject
to melting (PVC, PEX radiant tubing, etc.), the
special base must be used. A concrete pad is not
sufficient to protect combustible flooring.
2. USA, 808HE-810HE: for installation in room
which is large in comparison with size of boiler.
a. Front: 18”
b. Top: 51½”
c. Draft hood, rear, sides, and flue connector: 6”
3. Canada, 805H-810HE:
a. Top and front: 18” (45.7 cm)
b. Flue, rear and sides: 6” (15.2 cm)
D.
Provide clearance for servicing
and proper operation
(following clearances are recommended and may be
reduced to minimum clearances shown above):
1. Single boiler, 805H-807HE, Front/Top: 24” (61.0
cm)
2. Single boiler, 808HE-810HE, Front/Top: 48”
(122.0 cm)
3. Multiple/modular boiler, USA /Canada, Sides: 1”
(2.5 cm)
E.
Install boiler on level floor
as close to chimney as
possible. For basement installation provide a solid base
such as concrete or masonry construction if floor is not
level or if water may be encountered on floor around
boiler.
F.
Protect gas ignition system components
from
water (dripping, spraying, rain, etc.) during boiler
operation and service (circulator replacement, control
replacement, etc.).
G.
Provide combustion and ventilation air
in accordance
with applicable provisions of local building codes,
or the
National Fuel Gas Code
, NFPA 54/ANSI
Z223.1, Air for Combustion and Ventilation; or CAN/
CSA B149.1, Venting Systems and Air Supply for
Appliances.
Adequate combustion and ventilation air must be
provided to assure proper combustion.
The following guideline is based on the
National Fuel
Gas Code
, NFPA 54/ANSI Z223.1.
1. Determine volume of space (boiler room). Rooms
communicating directly with space (through
permanent openings not furnished with doors) are
considered part of space.
Volume [ft
3
] = Length [ft] x Width [ft] x Height [ft]
2. Determine Total Input of all appliances in space.
Round result to nearest 1,000 Btu per hour (Btuh).
3. Determine type of space. Divide Volume by Total
Input.
a. If result is greater than or equal to 50 ft
3
per
1,000 Btuh, space is considered an
unconfined
space
.
Boiler Model
Special Base Part Number
805H
61816055
806H
61816065
807HE
61816075
808HE
61816085
809HE
61816095
810HE
61816105
Table 2: Special Base Required for Installation on
Combustible Flooring
Содержание 805H
Страница 13: ...13 Figure 6 Flame Roll out Switch Installation Figure 7 Burner Burner Access Panel Installation...
Страница 15: ...15 Figure 8 Jacket Assembly...
Страница 16: ...16 Figure 9 EP Control Installation...
Страница 18: ...18 Figure 10 Schematic Gas Piping 24V Standing Pilot 806H 807HE...
Страница 19: ...19 Figure 11 Main Gas Piping Intermittent Ignition EI...
Страница 20: ...20 Figure 12 Schematic Pilot Piping Honeywell EI USA...
Страница 21: ...21 Figure 13 Schematic Pilot Piping Honeywell EI Canada Natural Gas 805H 810HE LP Gas 806H 807HE...
Страница 22: ...22 Figure 14 Schematic Gas Piping EP Control System Natural Gas Only 806H 810HE...
Страница 23: ...23 Figure 15 Schematic Gas Piping EP CSD 1 Control System 808HE 810HE...
Страница 36: ...36 Figure 27 Wiring Diagram Standing Pilot 24V Continuous Circulation 806H 807HE...
Страница 37: ...37 Figure 28 Wiring Diagram Standing Pilot 24V Intermittent Circulation 806H 807HE...
Страница 39: ...39 Figure 29 Wiring Diagram Honeywell EI USA Canada 805 Only with Hydrostat 3200 Control...
Страница 40: ...40 Figure 30 Wiring Diagram Honeywell EI USA Continuous Circulation 806 810...
Страница 41: ...41 Figure 31 Wiring Diagram Honeywell EI USA Intermittent Circulation 806 810...
Страница 42: ...42 Figure 32 Wiring Diagram Honeywell EI Canada Continuous Circulation Natural 806H 810HE LP 806H 807HE...
Страница 43: ...43 Figure 33 Wiring Diagram Honeywell EI Canada Intermittent Circulation Natural 806H 810HE LP 806H 807HE...
Страница 50: ...50 Figure 40 Lighting Instructions 24V Standing Pilot...
Страница 51: ...51 Figure 41 Operating Instructions EI...
Страница 52: ...52 Figure 42 Operating Instructions EP...
Страница 61: ...61 Honeywell EI Trouble Shooting Guide...
Страница 76: ...76...
Страница 78: ...78...
Страница 82: ...82...
Страница 83: ...83...
Страница 84: ...84...