5. Roll boiler until 3" roller is located as shown. Use
pry bar to install wood blocks under front corners of
base. Remove 3" roller.
6. Lift boiler with pry bar. Remove wood blocks.
Lower boiler.
C.
For Packaged Boiler only, proceed to Paragraph E.
D.
Test Section Assembly for leaks
before connecting to
system and installing controls, trim and jacket.
Refer
to Figure 3 and Table 3.
1. Plug Tappings C & E (¾ NPT) and Return Tapping
B (2 NPT).
2. Insert ¾" NPT x ¼" NPT bushing in Tapping D.
Install pressure gauge capable of indicating 50 psi.
3. Insert 2" NPT x ¾" NPT bushing in Supply
Tapping A. Install purge valve with a hose that
runs to a drain.
4. Connect fill valve and piping to Drain Tapping G.
G
N
I
N
R
A
W
.
r
e
l
i
o
b
t
s
e
t
k
a
e
l
o
t
r
i
a
e
s
u
t
o
n
o
D
5. Fill boiler completely with water by venting air
through purge valve. Close purge valve and apply
water pressure of at least 10 psi but less than 50 psi
gauge pressure.
6. Examine boiler for leaks or damage due to
shipment or handling.
7. Remove plugs from Return Tapping B, Tapping C,
and Tapping E (if second limit or operating control
is used). Also remove fill valve and piping, purge
valve and piping, and pressure gauge.
E.
Install special base
if installation is on combustible
flooring. See Figure 4. Floor shield adds 4¾" to boiler
height.
1. Place special base on combustible floor with surface
marked "FRONT" in upward position.
2. Locate special base with spacing to combustible
materials as shown in Figure 4.
3. Place boiler on special base. Boiler must rest inside
locating brackets. Boiler jacket panels will
overhang special base.
4. Do not enclose boiler (including special base) on all
four sides. Models 805B - 807B may be enclosed
Содержание 805B
Страница 11: ...11 Figure 6 Flame Roll out Switch Installation Figure 7 Burner Burner Access Panel Installation...
Страница 13: ...13 Figure 8 Jacket Assembly...
Страница 14: ...14 Figure 9 EP OP Control Installation...
Страница 17: ...17 Figure 10 Schematic Gas Piping 24V Standing Pilot 806B 807B...
Страница 18: ...18 Figure 11 Main Gas Piping Intermittent Ignition EI...
Страница 19: ...19 Figure 12 Schematic Pilot Piping Honeywell EI USA...
Страница 20: ...20 Figure 13 Schematic Pilot Piping Honeywell EI Canada Natural Gas 805B 810B LP Gas 806B 807B...
Страница 21: ...21 Figure 14 Schematic Pilot Piping Johnson EI USA...
Страница 22: ...22 Figure 15 Schematic Pilot Piping Johnson EI Canada Natural Gas 805B 810B LP Gas 806B 807B...
Страница 23: ...23 Figure 16 Schematic Gas Piping OP Control System 806B 810B...
Страница 24: ...24 Figure 17 Schematic Gas Piping OP CSD 1 Control System 808B 810B...
Страница 25: ...25 Figure 18 Schematic Gas Piping EP Control System Natural Gas Only 806B 810B...
Страница 26: ...26 Figure 19 Schematic Gas Piping EP CSD 1 Control System 808B 810B...
Страница 30: ...30 Figure 25 Recommended Boiler Piping for Circulator Zoned Heating Systems...
Страница 39: ...39 Figure 31 Wiring Diagram Standing Pilot 24 USA and Canada Continuous Circulation...
Страница 40: ...40 Figure 32 Wiring Diagram Standing Pilot 24V USA and Canada Intermittent Circulation...
Страница 42: ...42 Figure 33 Wiring Diagram OP OP CSD 1 Ignition System Continuous Circulation...
Страница 43: ...43 Figure 34 Wiring Diagram OP OP CSD 1 Ignition System Intermittent Circulation...
Страница 45: ...45 Figure 35 Wiring Diagram Honeywell EI USA Continuous Circulation...
Страница 46: ...46 Figure 36 Wiring Diagram Honeywell EI USA Intermittent Circulation...
Страница 47: ...47 Figure 37 Wiring Diagram Honeywell EI Canada Continuous Circulation...
Страница 48: ...48 Figure 38 Wiring Diagram Honeywell EI Canada Intermittent Circulation...
Страница 50: ...50 Figure 39 Wiring Diagram Johnson EI USA Continuous Circulation...
Страница 51: ...51 Figure 40 Wiring Diagram Johnson EI USA Intermittent Circulation...
Страница 52: ...52 Figure 41 Wiring diagram Johnson EI Canada Continuous Circulation...
Страница 53: ...53 Figure 42 Wiring Diagram Johnson EI Canada Intermittent Circulation...
Страница 55: ...55 Figure 43 Wiring Diagram EP EP CSD 1 Ignition System USA Continuous Circulation...
Страница 56: ...56 Figure 44 Wiring Diagram EP EP CSD 1 Ignition System USA Intermittent Circulation...
Страница 60: ...60 Figure 49 Lighting Instructions 24V Standing Pilot...
Страница 61: ...61 Figure 50 Operating Instructions EI...
Страница 62: ...62 Figure 51 Lighting Instructions OP...
Страница 63: ...63 Figure 52 Operating Instructions EP...
Страница 71: ...71 Honeywell EI Trouble Shooting Guide...
Страница 72: ...72 Johnson EI Trouble Shooting Guide...
Страница 73: ...73...
Страница 74: ...74 SERVICE RECORD DATE SERVICE PERFORMED...
Страница 94: ...94...
Страница 97: ...97...