Burnham 805B Скачать руководство пользователя страница 100

100

COMMERCIAL CAST IRON BOILERS — SERIES 5B, 8B, V9 and V11

T

T

T

T

Ten Year Limited Warranty

en Year Limited Warranty

en Year Limited Warranty

en Year Limited Warranty

en Year Limited Warranty

parts and accessories manufactured by others are not covered by these
warranties and will be subject only to the manufacturer’s warranty, if any.

b.)  Improper Installation. Claims arising from or relating to improper

installation are not covered by these warranties.

c.)  Natural Disasters.  Claims arising from or relating to damage caused

by  natural disasters, including, but not limited to, lightening, fire, earthquake,
hurricane, tornado, or floods are not covered by these warranties.

d.)  Alterations.  Claims arising from or relating to any alteration or other

modification not authorized by Burnham Commercial in writing are not covered
by these warranties.

e.)  Misuse.  The following claims are not covered by these warranties:

claims arising from or relating to (i) misuse, abuse, mishandling, accident,
neglect or improper service or operation of a Boiler, including, but not limited
to, improper burner adjustment, control setting or maintenance and thermal
shock from low water temperatures; (ii) operation of a Boiler over its rated
capacity; (iii) operation of a Boiler with insufficient water, excessive fresh
make-up water or inadequately deareated water; (iv) freezing of a Boiler or any
part or component thereof; (v) operation with combustion air contaminated
externally by chemical vapors or other contaminants, (vi) use of improper fuel
additives; or (vii) operation of a Boiler with inadequately or improperly treated
water that causes deposit build-up in the cast iron sections or other Boiler
components.

f.)  Subsequently Installed Accessories.  Claims arising from or relating to

Boiler accessories (including, but not limited to, circulators, air elimination
devices, deaerators, flow controls and low water cutoffs) which are installed
by Owner after delivery of the Boiler are not covered by these warranties.

5.  Exclusive Remedy.   If any Boiler, cast iron section or covered
component part fails to conform to these warranties, Owner’s exclusive
remedy  shall be to accept, at the option of Burnham Commercial, repair or
replacement of the non-conforming Boiler, cast iron section or other
component part.  These warranties do not cover  labor and other costs and
expenses associated with the removal and replacement of a non-conforming
Boiler, cast iron section or other component part, which costs and expenses
shall be the sole responsibility of Owner.

6.  Limitation of Damages.  Under no circumstances shall Burnham
Commercial be liable to Owner or to any other person for any indirect,
incidental, special, consequential, or punitive damages of any kind
whatsoever under these warranties or otherwise (including, without limitation,
injury or damage to persons or property, loss of time or labor expense
involved in repairing or replacing a non-conforming Boiler, loss of the use of
the Boiler,  and loss of profits, revenues or business, even if Burnham
Commercial has been advised of the possibility of such damages), whether
such damages are sought based upon breach of warranty, breach of contract,
negligence, strict liability or any other legal theory.  Burnham’s liability under
these warranties shall under no circumstances exceed the purchase price
paid by the Owner for the Boiler involved.

7.  Exclusivity and Disclaimer.  These warranties are given in lieu of all other
express warranties and set forth the entire obligation of Burnham Commercial
with respect to any defective or otherwise non-conforming Boiler and Burnham
Commercial shall have no obligations, responsibilities or liabilities of any kind
whatsoever, except as set forth herein.
EXCEPT AS SET FORTH IN THESE WARRANTIES, BURNHAM MAKES NO
OTHER WARRANTIES, EXPRESS OR IMPLIED, INCLUDING, WITHOUT
LIMITATION, ANY IMPLIED WARRANTY OF MERCHANTABILITY, ANY
IMPLIED WARRANTY OF FITNESS FOR A PARTICULAR PURPOSE AND ANY
OTHER IMPLIED WARRANTY ARISING OUT OF A COURSE OF DEALING OR
PERFORMANCE, CUSTOM, USAGE OF TRADE OR OTHERWISE.

8.  No Authority to Expand Warranty.  No sales representative, agent or
distributor or has authority to expand or otherwise modify in any way the
scope of these warranties or the obligations of Burnham Commercial
hereunder.  No such modification shall be binding unless set forth in a written
document signed by a duly authorized officer of Burnham
Commercial.

9.  Effective Date.  This statement of warranties is effective as to all Boilers
sold on or after July 17, 2000 and supersedes all prior warranty statements.

Burnham Commercial™ hereby warrants to the original owner  (“Owner”) of
each Series 5B, 8B, V9, and V11 commercial cast iron boiler ( a “Boiler”)
manufactured by Burnham Commercial, as follows:

First Year -  Limited Warranty:  Burnham Commercial warrants that each
Boiler will comply, at the time of manufacture, with recognized hydronics
industry regulatory standards and requirements as then in effect and will be
free from defects in material and workmanship under normal usage for a period
of one year from the date of original installation.  Subject to all of the terms
and conditions set forth below, if any Boiler, cast iron section, or component
part covered by this warranty is found not to conform with this warranty during
the one year warranty period, Burnham Commercial will, at its option, repair or
replace the non-conforming Boiler, cast iron section, or covered component
part.

Second through 10th Year - Limited Warranty for Cast Iron Sections:
Burnham Commercial warrants that the cast iron sections of each Boiler will be
free from defects in material and workmanship under normal usage for a period
of ten years from the date of original installation.  Subject to all of the terms
and conditions set forth below, if any cast iron section covered by this
warranty is found not to conform with this warranty during the warranty period,
Burnham Commercial will, at its option, repair or replace the non-conforming
cast iron section.
The foregoing warranties are subject to the following terms and conditions:

1.  Applicability.  These warranties extend only to the original Owner at the
original installation site and may not be assigned or otherwise transferred or
extended to any other person or entity.

2.  Claim Procedure.  Owner must contact the original installer and provide
the installer with a detailed description of  the claimed defect.  If the original
installer is unable to resolve the matter to Owner’s satisfaction, Owner must
notify Burnham Commercial in writing at Burnham Commercial, P.O. 3939,
Lancaster, PA 17605, which notice must be received by Burnham Commercial
prior to the expiration of the applicable warranty period.  Owner must make the
Boiler available for inspection by Burnham Commercial and, if requested to do
so by Burnham Commercial, must return the Boiler, cast iron section or
defective component part to Burnham Commercial, at Owner’s expense, for
inspection and/or repair.  Owner must cooperate with Burnham Commercial
and take all commercially reasonable efforts to resolve and settle any dispute
arising in connection with a warranty claim before resorting to legal remedies
in court.

3.  Conditions.  The foregoing warranties are subject to the following
conditions:

a.)  Installation Location.  The Boiler must be installed within the

continental limits of the United States and Canada.

b.)  Proper Installation.  The Boiler must be installed by a qualified heating

contractor (whose principal business is the sale, installation and maintenance
of commercial boilers and related equipment) in strict accordance with the
Installation and Operating Instructions Manual furnished with the Boiler and
must not have been damaged prior to or during installation.

c.)  Annual Service. The Boiler (including its related burner, controls, and

other components and accessories) must be serviced annually by a qualified
heating contractor (whose principal business is the sale, installation and
maintenance of commercial boilers and related equipment) and proof of such
service must be provided with each warranty claim. The required annual
service must include all service and maintenance procedures specified in the
Installation and Operating Instructions Manual furnished with the Boiler and all
service and maintenance procedures specified in any instruction manual or
similar document prepared by the manufacturer of the burner, controls and
other components and accessories.  Such annual service must also be
performed in accordance with all applicable industry standards and
procedures.

d.)  Proper Operation and Maintenance.  The Boiler must be operated and

maintained in strict accordance with the Installation and Operating
Instructions Manual furnished with the Boiler and all applicable industry
standards and procedures.

e.)  No Alterations. The Boiler must not have been modified, altered or

changed in any manner.

f.)  Proper Application.  The Boiler must be used exclusively for purposes

of commercial space heating or domestic hot water generation through a heat
exchanger (or for a combination of such purposes).

4.  Exclusions.  The foregoing warranties do not cover claims arising from or
relating to any of the following:

a.)  Component Parts and Accessories. Claims relating to component

03/03

Содержание 805B

Страница 1: ...s a r e b m u N l a i r e S d n a r e b m u N l e d o M r e l i o B e d i v o r p r e b m u N l e d o M r e l i o B r e b m u N l a i r e S r e l i o B e t a D n o i t a l l a t s n I _ _ _ _ _ _ _ _...

Страница 2: ...a i t n a t s b u s r o y r u j n i s u o i r e s e g a m a d E C I T O N n o s n o i t c u r t s n i l a i c e p s s e t a c i d n I e c n a n e t n i a m r o n o i t a r e p o n o i t a l l a t s n...

Страница 3: ...c o l s l i a t e d d n a n w o d t u h s o t r e l i o b e h t e s u a c y a m h c i h w s e c i v e d y t e f a s h t i w d e i l p p u s s i r e l i o b s i h T g n i t a e h e h t y t i l i b i s...

Страница 4: ...Pre Installation 6 II BoilerAssembly 8 III Gas Control System Assembly 15 KnockdownBoilers IV Water Trim and Piping 27 V GasPiping 31 VI Venting 33 VII Electrical 36 VIII System Start up 59 IX Servic...

Страница 5: ...f 5 1 x a i d 9 9 5 1 5 7 8 B 8 0 8 4 1 1 3 8 5 5 1 9 6 1 3 1 0 3 6 1 1 1 6 2 0 2 6 1 t f 5 1 x a i d 9 9 7 1 0 8 9 B 9 0 8 5 3 2 1 7 1 0 1 2 1 3 3 6 1 7 6 2 2 2 5 1 t f 5 1 x a i d 0 1 9 9 1 0 8 0 1...

Страница 6: ...hority having jurisdiction the installation must conform to the Standard for Controls and Safety Devices for Automatically Fired Boilers ANSI ASME No CSD 1 C Provide clearance between combustible mate...

Страница 7: ...mum free area of 1 square inch per 3 000 Btu per hour input of all equipment in space ii Free area shall not be less than the sum of the areas of all vent connectors in the confined space Alternate me...

Страница 8: ...hold down bolts 2 Using pry bar under rear corner of Base End Panel raise boiler and install 1 wood blocks under rear corners Install pipe roller between Base and skid 3 Remove 1 wood blocks Place 3...

Страница 9: ...s e t k a e l o t r i a e s u t o n o D 5 Fill boiler completely with water by venting air through purge valve Close purge valve and apply water pressure of at least 10 psi but less than 50 psi gauge...

Страница 10: ...ds are only hand tight to allow for thermal expansion I Install Base Front Panel See Figure 5 Panel and hardware located in Combination Boiler Parts and Control Carton 1 Attach Base Front Panel to Sec...

Страница 11: ...11 Figure 6 Flame Roll out Switch Installation Figure 7 Burner Burner Access Panel Installation...

Страница 12: ...ld 1 Cut insulation from semicircular notch at right end of the burner access panel Models 808B 810B have two 2 burner access panels Remove insulation from notch of right side burner access panel only...

Страница 13: ...13 Figure 8 Jacket Assembly...

Страница 14: ...14 Figure 9 EP OP Control Installation...

Страница 15: ...lon cable tie between junction box and transformer control center b Attach transformer control center to junction box C OPControlSystem Install Gas Control System All components are located in Combina...

Страница 16: ...piping and controls See Figure 19 3 InstallIgnitionTransformer a Attach Ignition Transformer to Jacket Vestibule Panel using four 4 8 x lg sheet metal screws b Connect Ignition Lead from Pilot to Igni...

Страница 17: ...17 Figure 10 Schematic Gas Piping 24V Standing Pilot 806B 807B...

Страница 18: ...18 Figure 11 Main Gas Piping Intermittent Ignition EI...

Страница 19: ...19 Figure 12 Schematic Pilot Piping Honeywell EI USA...

Страница 20: ...20 Figure 13 Schematic Pilot Piping Honeywell EI Canada Natural Gas 805B 810B LP Gas 806B 807B...

Страница 21: ...21 Figure 14 Schematic Pilot Piping Johnson EI USA...

Страница 22: ...22 Figure 15 Schematic Pilot Piping Johnson EI Canada Natural Gas 805B 810B LP Gas 806B 807B...

Страница 23: ...23 Figure 16 Schematic Gas Piping OP Control System 806B 810B...

Страница 24: ...24 Figure 17 Schematic Gas Piping OP CSD 1 Control System 808B 810B...

Страница 25: ...25 Figure 18 Schematic Gas Piping EP Control System Natural Gas Only 806B 810B...

Страница 26: ...26 Figure 19 Schematic Gas Piping EP CSD 1 Control System 808B 810B...

Страница 27: ...t l u s e r y a m r e l i o b e p i p y l r e p o r p o t e r u l i a F e r u t c u r t s r e l i o b l e e t s d n a n o r i f o n o i s o r r o c e s u a c l l i w r e t a w r e l i o b f o n o i t...

Страница 28: ...um inchclearancefromhot water piping to combustible materials 1 If boiler is used in connection with refrigeration systems boiler must be installed with chilled medium piped in parallel with heating b...

Страница 29: ...29 Figure 22 Temperature Pressure Gauge Installation Figure 23 Alternate Temperature Pressure Gauge Installation Figure 24 Recommended Piping for Combination Heating Cooling Refrigeration System...

Страница 30: ...30 Figure 25 Recommended Boiler Piping for Circulator Zoned Heating Systems...

Страница 31: ...t compound pipe dope resistant to action of liquefied petroleum gas 3 Install sediment trap ground joint union and manual shut off valve upstream of boiler gas valve and outside jacket See Figure 26 4...

Страница 32: ...8 0 h t g n e L t e e F p o r D e r u s s e r P c w h c n i 3 0 p o r D e r u s s e r P c w h c n i 5 0 1 1 1 1 0 1 2 3 1 8 7 2 0 2 5 0 5 0 1 5 7 1 0 6 3 0 8 6 0 0 4 1 0 2 2 9 0 9 1 0 5 3 0 3 7 0 2 1...

Страница 33: ...Hood skirt Locate center tooth with 10 sheet metal screw on outside and other two teeth inside Draft Hood skirt See Figure 27 3 Slide mounting bracket tight against lower edge of Draft Hood skirt Posi...

Страница 34: ...of this appliance into any portion of mechanical draft system operating under positive pressure 3 Vent connector should have the greatest possible initial rise above the draft hood consistent with th...

Страница 35: ...s outlined above return doors windows exhaust fans fireplace dampers and any other gas burning appliance to their previous condition of use 7 Any improper operation of the common venting system should...

Страница 36: ...e n o n a h t e r o m m o r f e b y a m r e w o p l a c i r t c e l E k r o w l a c i r t c e l e y n a g n i t p m e t t a t c e n n o c s i d d e s u f d e z i s y l r e p o r p a h t i w d e t c e...

Страница 37: ...he damper blade reaches the fully closed position the damper motor is de energized POWERFAILURE Thedamperbladewillstopin the position it was in when power failed Combustion can never take place unless...

Страница 38: ...ner gas flow should pilot burner flame extinguish Circulator continues to operate and Vent Damper if used remains open with call for heat Table 10 Sequence of Operation and Wiring Diagrams m e t s y S...

Страница 39: ...39 Figure 31 Wiring Diagram Standing Pilot 24 USA and Canada Continuous Circulation...

Страница 40: ...40 Figure 32 Wiring Diagram Standing Pilot 24V USA and Canada Intermittent Circulation...

Страница 41: ...additionalcontrol information 3 ElectronicallySupervisedStandingPilot OP CSD 1 Sequence of Operation a NormalOperation i Thermostat or operating control calls for heat ii Terminal 6ofRM7890CBurnerCont...

Страница 42: ...42 Figure 33 Wiring Diagram OP OP CSD 1 Ignition System Continuous Circulation...

Страница 43: ...43 Figure 34 Wiring Diagram OP OP CSD 1 Ignition System Intermittent Circulation...

Страница 44: ...ain burner operation when excessive flue gas spillage occurs Circulator continues to operate and Vent Damper if used remains open with call for heat If blocked vent switch is activated do not attempt...

Страница 45: ...45 Figure 35 Wiring Diagram Honeywell EI USA Continuous Circulation...

Страница 46: ...46 Figure 36 Wiring Diagram Honeywell EI USA Intermittent Circulation...

Страница 47: ...47 Figure 37 Wiring Diagram Honeywell EI Canada Continuous Circulation...

Страница 48: ...48 Figure 38 Wiring Diagram Honeywell EI Canada Intermittent Circulation...

Страница 49: ...main burner operation when excessive flue gas spillage occurs Circulator continues to operate Vent Damper if used remains open with call for heat If blocked vent switch is activated do not attempt to...

Страница 50: ...50 Figure 39 Wiring Diagram Johnson EI USA Continuous Circulation...

Страница 51: ...51 Figure 40 Wiring Diagram Johnson EI USA Intermittent Circulation...

Страница 52: ...52 Figure 41 Wiring diagram Johnson EI Canada Continuous Circulation...

Страница 53: ...53 Figure 42 Wiring Diagram Johnson EI Canada Intermittent Circulation...

Страница 54: ...or continues to operate with call for heat Normal operation resumes when water temperature falls below set point ii BlockedVentSwitch Automatically interrupts main burner operation when excessive flue...

Страница 55: ...55 Figure 43 Wiring Diagram EP EP CSD 1 Ignition System USA Continuous Circulation...

Страница 56: ...56 Figure 44 Wiring Diagram EP EP CSD 1 Ignition System USA Intermittent Circulation...

Страница 57: ...57 Figure 46 McDonnell Miller PS 851 120V L W C O Wiring for Boilers with 120V Limit Circuits OP EP Figure 45 McDonnell Miller PS 851 120V L W C O Wiring for Boilers with 24V Limit Circuits...

Страница 58: ...58 Figure 47 Hydrolevel OEM 170 550 650 750 120V L W C O Wiring for Boilers with 24V Limit Circuits Figure 48 Hydrolevel OEM 170 550 650 750 120V L W C O Wiring for Boilers with 120V Limit Circuits...

Страница 59: ...other components are leak free Eliminate any leaks 8 Purge gas line of air Table 11 Lighting and Operating Instructions 1 Close full port ball valve in boiler supply piping 2 Isolate all zones by clo...

Страница 60: ...60 Figure 49 Lighting Instructions 24V Standing Pilot...

Страница 61: ...61 Figure 50 Operating Instructions EI...

Страница 62: ...62 Figure 51 Lighting Instructions OP...

Страница 63: ...63 Figure 52 Operating Instructions EP...

Страница 64: ...r e t f a d e t h g i l s n i a m e r t o l i p l i t n u r o e t u n i m e n o t s a e l g n i d n a t s g n i n i a m e r r o f t a e p e R d e s a e l e r s i n o t t u b s t o l i p 6 h c t i w s...

Страница 65: ...Johnson J991 Pilot Flame 24V Electronic Ignition I Checkpilotburnerflameandmainburnerflames through observation port 1 Check pilot flame Refer to Table 11 for appropriate pilot detail 2 Adjust thermos...

Страница 66: ...eading Main burners should reignite 4 Adjust thermostat to lowest setting Adjust limit to desired setting M Adjust gas input rate to boiler Natural Gas 1 Adjust thermostat to highest setting 2 Check m...

Страница 67: ...al regulations P CheckDamperOperation Ifboilerisequippedwith vent damper vent damper must be in open position when boiler main burners are operating Start boiler refer to instructions on damper to det...

Страница 68: ...ft Hood 3 Remove Jacket Top Panel 4 Remove Canopy from top of boiler 5 Thoroughly clean flueways with flue brush removing all scale and soot See Figure 60 6 Clean boiler heating surface accessible fro...

Страница 69: ...thing 3 Gloves 4 Eye Protection Take steps to assure adequate ventilation Wash all exposed body areas gently with soap and water after contact Wash work clothes separately from other laundry and rinse...

Страница 70: ...avoid damaging Base Insulation G Install Burners by reversing procedures used to remove burners Verify Main Burners are properly located on support bracket in Base Rear Panel seated on Main Burner Ori...

Страница 71: ...71 Honeywell EI Trouble Shooting Guide...

Страница 72: ...72 Johnson EI Trouble Shooting Guide...

Страница 73: ...73...

Страница 74: ...74 SERVICE RECORD DATE SERVICE PERFORMED...

Страница 75: ...lesale distributor Should you require assistance in locating a Burnham Distributor in your area or have questions regarding the availability of Burnham products or repair parts please contact Burnham...

Страница 76: ...E t f e L 1 0 6 1 7 1 7 1 1 1 1 1 1 B 1 n o i t c e S e t a i d e m r e t n I 3 0 6 1 7 1 7 3 4 5 6 7 8 C 1 n o i t c e S d n E t h g i R 2 0 6 1 7 1 7 1 1 1 1 1 1 D 1 d o R e i T 2 3 0 1 6 8 0 8 1 d...

Страница 77: ...9 0 8 B 0 1 8 y p o n a C 2 A 2 y p o n a C 5 0 6 1 1 1 6 1 6 0 6 1 1 1 6 1 7 0 6 1 1 1 6 1 8 0 6 1 1 1 6 1 9 0 6 1 1 1 6 1 0 1 6 1 1 1 6 1 B 2 1 x 0 2 e g a i r r a C t l o B 5 1 1 0 6 8 0 8 2 2 2 2...

Страница 78: ...b m e s s A l e n a P s s e c c A r e n r u B 4 5 0 6 1 8 1 6 1 4 6 0 6 1 8 1 6 1 4 7 0 6 1 8 1 6 1 4 8 0 6 1 8 1 6 2 4 9 0 6 1 8 1 6 2 4 0 1 6 1 8 1 6 2 F 3 t e k c a r B t n e m h c a t t A t e k c...

Страница 79: ...o l i P h t i w r e n r u B n i a M 3 0 6 1 3 2 8 1 1 1 1 1 P E t e k c a r B t o l i P h t i w r e n r u B n i a M C 4 d l o f i n a M 1 5 0 6 1 2 2 8 1 1 6 0 6 1 2 2 8 1 1 7 0 6 1 2 2 8 1 1 8 0 6 1...

Страница 80: ...l e w y e n o H e v l a V s a G d i o n e l o S 5 3 2 0 6 6 1 8 B 7 0 8 B 6 0 8 1 T P N 1 2 3 0 1 A 5 9 2 8 V l l e w y e n o H e v l a V s a G d i o n e l o S 6 3 2 0 6 6 1 8 B 0 1 8 B 8 0 8 C T P N...

Страница 81: ...a M e v l a V T P N 1 2 0 3 0 4 0 5 o C a r B n o C 5 1 6 2 2 8 1 D 8 1 x 8 1 1 0 1 2 2 6 5 o C a r B n o C e v l a V f f o t u h S t s e T k a e L 9 7 6 2 2 8 2 E 8 1 g u l P e p i P 4 9 5 3 0 6 6 0...

Страница 82: ...e b o R e v l a V s a G 1 5 1 0 6 6 1 8 B 0 1 8 B 5 0 8 1 T P N 1 s a G P L P L C H R E D 0 0 0 7 w a h s t r e b o R e v l a V s a G 8 5 1 0 6 6 1 8 B 0 1 8 B 5 0 8 A S U B 7 0 8 B 5 0 8 a d a n a C...

Страница 83: ...6 0 8 1 T P N 1 2 3 0 1 A 5 9 2 8 V l l e w y e n o H e v l a V s a G d i o n e l o S 6 3 2 0 6 6 1 8 B 0 1 8 B 8 0 8 C T P N 1 M 0 0 2 n e k i l l i M n a m w e N e v l a V f f O t u h S l a u n a M...

Страница 84: ...l a u n a M e v l a V T P N 1 2 0 3 0 4 0 5 o C a r B n o C 5 1 6 2 2 8 1 D 8 1 x 8 1 1 0 1 2 2 6 5 o C a r B n o C e v l a V f f o t u h S t s e T k a e L 9 7 6 2 2 8 2 E 8 1 g u l P e p i P 4 9 5 3...

Страница 85: ...L 8 2 8 3 A 4 1 3 Q l l e w y e n o H r e n r u B t o l i P 4 3 0 6 3 2 8 B d a e L g L 6 3 w 6 9 9 1 A 9 0 3 Q l l e w y e n o H e l p u o c o m r e h T 4 0 0 6 3 2 8 C e b u T D O n o i n U n o i s...

Страница 86: ...i t c e S 0 1 5 A s a G l a r u t a N 2 0 0 1 A 8 4 3 Q l l e w y e n o H r e n r u B t o l i P U 2 7 0 6 3 2 8 B 0 1 8 B 5 0 8 1 s a G P L 0 1 0 1 A 8 4 3 Q l l e w y e n o H r e n r u B t o l i P 1...

Страница 87: ...r p m o C s s a r B 8 0 0 6 3 2 8 B 7 0 8 B 5 0 8 1 E L 2 P x e s s E e v l a V f f o t u h S 5 4 6 2 2 8 B 0 1 8 B 8 0 8 1 F e l b a e l l a M T P N 8 1 e e T e p i P 5 0 0 1 0 6 6 0 8 G d a e H q S...

Страница 88: ...o s n h o J r e n r u B t o l i P d a e L n o i t i n g I s e d u l c n I 0 5 0 6 3 2 8 B 0 1 8 B 5 0 8 1 s a G P L D 0 4 8 9 W Y L 1 9 9 J n o s n h o J r e n r u B t o l i P d a e L n o i t i n g I...

Страница 89: ...G 4 5 0 6 3 1 6 1 E e b u T D O n o i n U n o i s s e r p m o C s s a r B 8 0 0 6 3 2 8 B 7 0 8 B 5 0 8 1 F L 2 P x e s s E e v l a V f f o t u h S 5 4 6 2 2 8 B 0 1 8 B 8 0 8 1 G e l b a e l l a M T...

Страница 90: ...l F 1 6 5 2 6 3 1 7 1 D 6 5 3 7 3 l l e w y e n o H r o t c e n n o C h a j a R 1 2 0 6 3 2 8 1 E y l b m e s s A e r i W d n u o r G 9 5 2 6 3 1 6 1 F e b u T D O n o i n U n o i s s e r p m o C s s...

Страница 91: ...e h T 4 0 0 6 3 2 8 1 C g L t f 4 0 2 0 8 9 2 1 R l l e w y e n o H d a e L d o R e m a l F 1 6 5 2 6 3 1 7 1 D 6 5 3 7 3 l l e w y e n o H r o t c e n n o C h a j a R 1 2 0 6 3 2 8 1 E y l b m e s s...

Страница 92: ...a r B 8 0 0 6 3 2 8 B 7 0 8 B 6 0 8 a d a n a C A S U B 0 1 8 B 8 0 8 y l n O A S U 1 G L 2 P x e s s E e v l a V f f o t u h S 5 4 6 2 2 8 B 0 1 8 B 8 0 8 y l n O a d a n a C 1 H e l b a e l l a M T...

Страница 93: ...y e n o H d a e L n o i t i n g I 7 4 2 6 3 1 7 1 E y l b m e s s A e r i W d n u o r G 9 5 2 6 3 1 6 1 F n o i s s e r p m o C s s a r B e b u T D O 4 1 g n i l p u o C 8 0 0 6 3 2 8 1 G 8 1 x 8 1 k...

Страница 94: ...94...

Страница 95: ...B 6 l e n a P r a e R r e p p U t e k c a J 5 5 0 6 1 4 0 6 1 5 6 0 6 1 4 0 6 1 5 7 0 6 1 4 0 6 1 5 8 0 6 1 4 0 6 1 5 9 0 6 1 4 0 6 1 5 0 1 6 1 4 0 6 1 C 6 l e n a P r a e R r e w o L t e k c a J 6 5...

Страница 96: ...4 0 6 1 1 1 1 1 1 G 6 l e n a P e d i S t h g i R t e k c a J 2 0 6 1 4 0 6 1 1 1 1 1 1 H 6 l e n a P e l u b i t s e V t e k c a J 3 5 0 6 1 4 0 6 1 3 6 0 6 1 4 0 6 1 3 7 0 6 1 4 0 6 1 3 8 0 6 1 4 0...

Страница 97: ...97...

Страница 98: ...e v l a V n i a r D 1 6 0 3 0 6 6 0 8 1 1 1 1 1 1 1 E 3 x T P N e l p p i N 8 3 0 0 0 6 6 0 8 1 1 1 1 1 1 2 E T P N g n i l p u o C 1 6 5 2 0 6 6 0 8 1 1 1 1 1 1 F y l b m e s s A t n e m e c a l p e...

Страница 99: ...1 1 9 0 6 1 1 1 8 1 1 B 8 7 r e p m a D t n e V c i t a m o t u A 7 S K P G V R l a k i f f E 6 4 1 6 1 1 8 1 8 r e p m a D t n e V c i t a m o t u A 8 S K P G V R l a k i f f E 7 4 1 6 1 1 8 1 9 r e...

Страница 100: ...arranty statements Burnham Commercial hereby warrants to the original owner Owner of each Series 5B 8B V9 and V11 commercial cast iron boiler a Boiler manufactured by Burnham Commercial as follows Fir...

Отзывы: