IV. Water Trim and Piping
A.
Design and install boiler and system piping
to prevent
oxygen contamination of boiler water and frequent water
additions.
1. There are many possible causes of oxygen
contamination such as:
a. Addition of excessive make-up water as a result
of system leaks.
b. Absorption through open tanks and fittings.
c. Oxygen permeable materials in the distribution
system.
2. In order to insure long product life, oxygen sources
must be eliminated. This can be accomplished by
taking the following measures:
a. Repairing system leaks to eliminate the need for
addition of make-up water.
b. Eliminating open tanks from the system.
c. Eliminating and/or repairing fittings which allow
oxygen absorption.
d. Use of non-permeable materials in the
distribution system.
e. Isolating the boiler from the system water by
installing a heat exchanger.
f. Use properly designed and operating air
elimination devices in water piping.
B
. Design system to obtain a 20°F temperature rise through
the boiler (see Table 4). If a temperature rise greater
than 40°F is desired, consult Burnham.
C.
Install Safety Relief Valve
. See Figure 20. Components
are located in Water Trim Carton. Safety Relief Valve
must be installed with spindle in vertical position.
1. Install ¾" NPT x 3½" lg. nipple in tapping "C". See
Figure 3.
G
N
I
N
R
A
W
r
o
r
e
l
i
o
b
o
t
e
g
a
m
a
d
d
n
a
n
o
i
t
a
r
e
p
o
r
e
p
o
r
p
m
i
n
i
t
l
u
s
e
r
y
a
m
r
e
l
i
o
b
e
p
i
p
y
l
r
e
p
o
r
p
o
t
e
r
u
l
i
a
F
.
e
r
u
t
c
u
r
t
s
r
e
l
i
o
b
l
e
e
t
s
d
n
a
n
o
r
i
f
o
n
o
i
s
o
r
r
o
c
e
s
u
a
c
l
l
i
w
r
e
t
a
w
r
e
l
i
o
b
f
o
n
o
i
t
a
n
i
m
a
t
n
o
c
n
e
g
y
x
O
s
m
e
l
b
o
r
p
r
e
v
o
c
t
o
n
s
e
o
d
y
t
n
a
r
r
a
W
s
'
m
a
h
n
r
u
B
.
e
r
u
l
i
a
f
r
e
l
i
o
b
o
t
d
a
e
l
n
a
c
d
n
a
,
s
t
n
e
n
o
p
m
o
c
t
n
e
u
q
e
r
f
y
b
d
e
s
u
a
c
p
u
-
d
l
i
u
b
)
e
m
i
l
(
e
l
a
c
s
r
o
r
e
t
a
w
r
e
l
i
o
b
f
o
n
o
i
t
a
n
i
m
a
t
n
o
c
n
e
g
y
x
o
y
b
d
e
s
u
a
c
.
r
e
t
a
w
f
o
n
o
i
t
i
d
d
a
Table 4: Flow Rate, Temperature Rise, and
Pressure Drop
2. Install safety relief valve on ¾" NPT nipple.
G
N
I
N
R
A
W
t
s
u
m
g
n
i
p
i
p
e
g
r
a
h
c
s
i
d
e
v
l
a
v
f
e
i
l
e
r
e
r
u
s
s
e
r
P
e
r
e
v
e
s
f
o
l
a
i
t
n
e
t
o
p
e
h
t
t
a
h
t
h
c
u
s
d
e
p
i
p
e
b
y
n
a
n
i
e
p
i
p
T
O
N
O
D
.
d
e
t
a
n
i
m
i
l
e
s
i
s
n
r
u
b
T
O
N
O
D
.
r
u
c
c
o
d
l
u
o
c
g
n
i
z
e
e
r
f
e
r
e
h
w
a
e
r
a
.
s
p
a
c
r
o
s
g
u
l
p
,
s
e
v
l
a
v
f
f
o
t
u
h
s
y
n
a
l
l
a
t
s
n
i
e
g
r
a
h
c
s
i
d
r
e
p
o
r
p
r
o
f
s
e
d
o
C
l
a
c
o
L
t
l
u
s
n
o
C
.
t
n
e
m
e
g
n
a
r
r
a
g
n
i
p
i
p
R
E
L
I
O
B
E
Z
I
S
W
O
L
F
E
T
A
R
)
M
P
G
(
.
P
M
E
T
E
S
I
R
U
R
H
T
R
E
L
I
O
B
.
N
I
M
R
E
L
I
O
B
G
N
I
P
I
P
)
T
P
N
(
R
E
L
I
O
B
E
R
U
S
S
E
R
P
P
O
R
D
B
5
0
8
1
2
4
1
0
1
F
°
0
2
F
°
0
3
F
°
0
4
"
½
1
"
¼
1
"
¼
1
'
3
'
2
'
1
B
6
0
8
6
2
7
1
3
1
F
°
0
2
F
°
0
3
F
°
0
4
"
½
1
"
½
1
"
¼
1
'
3
'
2
'
1
B
7
0
8
1
3
1
2
5
1
F
°
0
2
F
°
0
3
F
°
0
4
"
2
"
½
1
"
¼
1
'
3
'
2
'
1
B
8
0
8
7
3
4
2
8
1
F
°
0
2
F
°
0
3
F
°
0
4
"
2
"
½
1
"
½
1
'
3
'
2
'
1
B
9
0
8
2
4
8
2
1
2
F
°
0
2
F
°
0
3
F
°
0
4
"
2
"
2
"
½
1
'
3
'
2
'
1
B
0
1
8
7
4
1
3
3
2
F
°
0
2
F
°
0
3
F
°
0
4
"
2
"
2
"
½
1
'
3
'
2
'
1
Содержание 805B
Страница 11: ...11 Figure 6 Flame Roll out Switch Installation Figure 7 Burner Burner Access Panel Installation...
Страница 13: ...13 Figure 8 Jacket Assembly...
Страница 14: ...14 Figure 9 EP OP Control Installation...
Страница 17: ...17 Figure 10 Schematic Gas Piping 24V Standing Pilot 806B 807B...
Страница 18: ...18 Figure 11 Main Gas Piping Intermittent Ignition EI...
Страница 19: ...19 Figure 12 Schematic Pilot Piping Honeywell EI USA...
Страница 20: ...20 Figure 13 Schematic Pilot Piping Honeywell EI Canada Natural Gas 805B 810B LP Gas 806B 807B...
Страница 21: ...21 Figure 14 Schematic Pilot Piping Johnson EI USA...
Страница 22: ...22 Figure 15 Schematic Pilot Piping Johnson EI Canada Natural Gas 805B 810B LP Gas 806B 807B...
Страница 23: ...23 Figure 16 Schematic Gas Piping OP Control System 806B 810B...
Страница 24: ...24 Figure 17 Schematic Gas Piping OP CSD 1 Control System 808B 810B...
Страница 25: ...25 Figure 18 Schematic Gas Piping EP Control System Natural Gas Only 806B 810B...
Страница 26: ...26 Figure 19 Schematic Gas Piping EP CSD 1 Control System 808B 810B...
Страница 30: ...30 Figure 25 Recommended Boiler Piping for Circulator Zoned Heating Systems...
Страница 39: ...39 Figure 31 Wiring Diagram Standing Pilot 24 USA and Canada Continuous Circulation...
Страница 40: ...40 Figure 32 Wiring Diagram Standing Pilot 24V USA and Canada Intermittent Circulation...
Страница 42: ...42 Figure 33 Wiring Diagram OP OP CSD 1 Ignition System Continuous Circulation...
Страница 43: ...43 Figure 34 Wiring Diagram OP OP CSD 1 Ignition System Intermittent Circulation...
Страница 45: ...45 Figure 35 Wiring Diagram Honeywell EI USA Continuous Circulation...
Страница 46: ...46 Figure 36 Wiring Diagram Honeywell EI USA Intermittent Circulation...
Страница 47: ...47 Figure 37 Wiring Diagram Honeywell EI Canada Continuous Circulation...
Страница 48: ...48 Figure 38 Wiring Diagram Honeywell EI Canada Intermittent Circulation...
Страница 50: ...50 Figure 39 Wiring Diagram Johnson EI USA Continuous Circulation...
Страница 51: ...51 Figure 40 Wiring Diagram Johnson EI USA Intermittent Circulation...
Страница 52: ...52 Figure 41 Wiring diagram Johnson EI Canada Continuous Circulation...
Страница 53: ...53 Figure 42 Wiring Diagram Johnson EI Canada Intermittent Circulation...
Страница 55: ...55 Figure 43 Wiring Diagram EP EP CSD 1 Ignition System USA Continuous Circulation...
Страница 56: ...56 Figure 44 Wiring Diagram EP EP CSD 1 Ignition System USA Intermittent Circulation...
Страница 60: ...60 Figure 49 Lighting Instructions 24V Standing Pilot...
Страница 61: ...61 Figure 50 Operating Instructions EI...
Страница 62: ...62 Figure 51 Lighting Instructions OP...
Страница 63: ...63 Figure 52 Operating Instructions EP...
Страница 71: ...71 Honeywell EI Trouble Shooting Guide...
Страница 72: ...72 Johnson EI Trouble Shooting Guide...
Страница 73: ...73...
Страница 74: ...74 SERVICE RECORD DATE SERVICE PERFORMED...
Страница 94: ...94...
Страница 97: ...97...