
70
Figure 60: Boiler Flueway Cleaning
Table 13: Pilot Burner Location
.
o
N
l
e
d
o
M
r
e
l
i
o
B
n
e
e
w
t
e
B
d
e
t
a
c
o
L
t
o
l
i
P
*
s
r
e
n
r
u
B
B
5
0
8
5
&
4
B
6
0
8
6
&
5
B
7
0
8
7
&
6
B
8
0
8
7
&
6
B
9
0
8
7
&
6
B
0
1
8
8
&
7
t
n
o
r
f
m
o
r
f
d
e
w
e
i
v
s
a
t
h
g
i
r
o
t
t
f
e
l
d
e
r
e
b
m
u
n
s
r
e
n
r
u
B
*
.
r
e
l
i
o
b
f
o
F.
Clean Combustion Chamber
by vacuuming. Exercise
care to avoid damaging Base Insulation.
G.
Install Burners
by reversing procedures used to
remove burners. Verify Main Burners are properly
located on support bracket in Base Rear Panel, seated
on Main Burner Orifices, and secured with hitch pin
clips. Verify Main Burner with Pilot Bracket is in
proper location. See Table 13.
H.
Lubrication.
Manufacturers Instruction should be
followed on all parts installed on boiler requiring
lubrication. This includes type of lubricant to be used,
frequency of lubrication, and points to lubricate.
I.
Check operation.
Refer to Section VIII: System Start-
up.
Содержание 805B
Страница 11: ...11 Figure 6 Flame Roll out Switch Installation Figure 7 Burner Burner Access Panel Installation...
Страница 13: ...13 Figure 8 Jacket Assembly...
Страница 14: ...14 Figure 9 EP OP Control Installation...
Страница 17: ...17 Figure 10 Schematic Gas Piping 24V Standing Pilot 806B 807B...
Страница 18: ...18 Figure 11 Main Gas Piping Intermittent Ignition EI...
Страница 19: ...19 Figure 12 Schematic Pilot Piping Honeywell EI USA...
Страница 20: ...20 Figure 13 Schematic Pilot Piping Honeywell EI Canada Natural Gas 805B 810B LP Gas 806B 807B...
Страница 21: ...21 Figure 14 Schematic Pilot Piping Johnson EI USA...
Страница 22: ...22 Figure 15 Schematic Pilot Piping Johnson EI Canada Natural Gas 805B 810B LP Gas 806B 807B...
Страница 23: ...23 Figure 16 Schematic Gas Piping OP Control System 806B 810B...
Страница 24: ...24 Figure 17 Schematic Gas Piping OP CSD 1 Control System 808B 810B...
Страница 25: ...25 Figure 18 Schematic Gas Piping EP Control System Natural Gas Only 806B 810B...
Страница 26: ...26 Figure 19 Schematic Gas Piping EP CSD 1 Control System 808B 810B...
Страница 30: ...30 Figure 25 Recommended Boiler Piping for Circulator Zoned Heating Systems...
Страница 39: ...39 Figure 31 Wiring Diagram Standing Pilot 24 USA and Canada Continuous Circulation...
Страница 40: ...40 Figure 32 Wiring Diagram Standing Pilot 24V USA and Canada Intermittent Circulation...
Страница 42: ...42 Figure 33 Wiring Diagram OP OP CSD 1 Ignition System Continuous Circulation...
Страница 43: ...43 Figure 34 Wiring Diagram OP OP CSD 1 Ignition System Intermittent Circulation...
Страница 45: ...45 Figure 35 Wiring Diagram Honeywell EI USA Continuous Circulation...
Страница 46: ...46 Figure 36 Wiring Diagram Honeywell EI USA Intermittent Circulation...
Страница 47: ...47 Figure 37 Wiring Diagram Honeywell EI Canada Continuous Circulation...
Страница 48: ...48 Figure 38 Wiring Diagram Honeywell EI Canada Intermittent Circulation...
Страница 50: ...50 Figure 39 Wiring Diagram Johnson EI USA Continuous Circulation...
Страница 51: ...51 Figure 40 Wiring Diagram Johnson EI USA Intermittent Circulation...
Страница 52: ...52 Figure 41 Wiring diagram Johnson EI Canada Continuous Circulation...
Страница 53: ...53 Figure 42 Wiring Diagram Johnson EI Canada Intermittent Circulation...
Страница 55: ...55 Figure 43 Wiring Diagram EP EP CSD 1 Ignition System USA Continuous Circulation...
Страница 56: ...56 Figure 44 Wiring Diagram EP EP CSD 1 Ignition System USA Intermittent Circulation...
Страница 60: ...60 Figure 49 Lighting Instructions 24V Standing Pilot...
Страница 61: ...61 Figure 50 Operating Instructions EI...
Страница 62: ...62 Figure 51 Lighting Instructions OP...
Страница 63: ...63 Figure 52 Operating Instructions EP...
Страница 71: ...71 Honeywell EI Trouble Shooting Guide...
Страница 72: ...72 Johnson EI Trouble Shooting Guide...
Страница 73: ...73...
Страница 74: ...74 SERVICE RECORD DATE SERVICE PERFORMED...
Страница 94: ...94...
Страница 97: ...97...