2. Electronically Supervised Standing Pilot (OP)
Sequence of Operation
a. Normal Operation
i
.
Thermostat or operating control calls for
heat.
ii
. Terminal #6 of RM7890C Burner Control is
energized, initiating a microcomputer
monitored circuit test.
iii
. Pilot Flame Establishing Period (PFEP)
begins.
iv
. After pilot flame is proven, terminal #9 of
RM7890C is energized, allowing main gas
flow and ignition of main burners. "Main"
gas light will be illuminated.
v
.
Call for heat ends. Terminal #6 of RM7890C
is de-energized, in turn de-energizing gas
valves and extinguishing main flame.
"Main" gas light is de-energized.
b. Safety Shutdown
i
.
Limit: Automatically interrupts main burner
operation when water temperature exceeds
set point. Maximum allowable temperature is
250°F. Circulator continues to operate with
call for heat. Normal operation resumes
when water temperature falls below set point.
ii
. Blocked Vent Switch: Automatically
interrupts main burner operation when
excessive flue gas spillage occurs. Circulator
continues to operate with call for heat. If
blocked vent switch is activated do not
attempt to place boiler in operation. Correct
cause of spillage and reset blocked vent
switch.
iii
. Flame Roll-out Switch: Automatically
interrupts main burner operation when
flames or excessive heat are present in
vestibule. Circulator continues to operate
with call for heat. Control is single use
device. If flame roll-out switch is activated,
do not attempt to place boiler in operation.
Correct cause of spillage and replace flame
roll-out switch.
iv
. RM7890C Burner Control: Automatically
interrupts main burner operation if a pilot
flame is not detected during the four or ten
second pilot flame establishing period. The
RM7890C will lockout or recycle based on
jumper settings. "Alarm" light will be
illuminated. Refer to instructions supplied
with RM7890C for additional control
information.
3. Electronically Supervised Standing Pilot (OP-CSD-1)
Sequence of Operation
a. Normal Operation
i
.
Thermostat or operating control calls for
heat.
ii
. Terminal #6 of RM7890C Burner Control is
energized, initiating a microcomputer
monitored circuit test.
iii
. Pilot Flame Establishing Period (PFEP)
begins.
iv
. After pilot flame is proven, terminal #9 of
RM7890C is energized, allowing main gas
flow and ignition of main burners. "Main"
gas light will be illuminated.
v
.
Call for heat ends. Terminal #6 of RM7890C
is de-energized, in turn de-energizing gas
valves and extinguishing main flame.
"Main" gas light is de-energized.
b. Safety Shutdown
i
.
Limit: Automatically interrupts main burner
operation when water temperature exceeds
set point. Maximum allowable temperature is
250°F. Circulator continues to operate with
call for heat. Normal operation resumes
when water temperature falls below set point.
ii
. Blocked Vent Switch: Automatically
interrupts main burner operation when
excessive flue gas spillage occurs. Circulator
continues to operate with call for heat. If
blocked vent switch is activated do not
attempt to place boiler in operation. Correct
cause of spillage and reset blocked vent
switch.
iii
. Flame Roll-out Switch: Automatically
interrupts main burner operation when
flames or excessive heat are present in
vestibule. Circulator continues to operate
with call for heat. Control is single use
device. If flame roll-out switch is activated,
do not attempt to place boiler in operation.
Correct cause of spillage and replace flame
roll-out switch.
iv
. RM7890C Burner Control: Automatically
interrupts main burner operation if a pilot
flame is not detected during the four or ten
second pilot flame establishing period. The
RM7890C will lockout or recycle based on
jumper settings. "Alarm" light will be
illuminated. Refer to instructions supplied
with RM7890C for additional control
information.
v.
Pilot Safety Switch: Automatically de-
energizes main gas valve and interrupts pilot
gas supply if pilot flame is not detected at
any time.
Содержание 805B
Страница 11: ...11 Figure 6 Flame Roll out Switch Installation Figure 7 Burner Burner Access Panel Installation...
Страница 13: ...13 Figure 8 Jacket Assembly...
Страница 14: ...14 Figure 9 EP OP Control Installation...
Страница 17: ...17 Figure 10 Schematic Gas Piping 24V Standing Pilot 806B 807B...
Страница 18: ...18 Figure 11 Main Gas Piping Intermittent Ignition EI...
Страница 19: ...19 Figure 12 Schematic Pilot Piping Honeywell EI USA...
Страница 20: ...20 Figure 13 Schematic Pilot Piping Honeywell EI Canada Natural Gas 805B 810B LP Gas 806B 807B...
Страница 21: ...21 Figure 14 Schematic Pilot Piping Johnson EI USA...
Страница 22: ...22 Figure 15 Schematic Pilot Piping Johnson EI Canada Natural Gas 805B 810B LP Gas 806B 807B...
Страница 23: ...23 Figure 16 Schematic Gas Piping OP Control System 806B 810B...
Страница 24: ...24 Figure 17 Schematic Gas Piping OP CSD 1 Control System 808B 810B...
Страница 25: ...25 Figure 18 Schematic Gas Piping EP Control System Natural Gas Only 806B 810B...
Страница 26: ...26 Figure 19 Schematic Gas Piping EP CSD 1 Control System 808B 810B...
Страница 30: ...30 Figure 25 Recommended Boiler Piping for Circulator Zoned Heating Systems...
Страница 39: ...39 Figure 31 Wiring Diagram Standing Pilot 24 USA and Canada Continuous Circulation...
Страница 40: ...40 Figure 32 Wiring Diagram Standing Pilot 24V USA and Canada Intermittent Circulation...
Страница 42: ...42 Figure 33 Wiring Diagram OP OP CSD 1 Ignition System Continuous Circulation...
Страница 43: ...43 Figure 34 Wiring Diagram OP OP CSD 1 Ignition System Intermittent Circulation...
Страница 45: ...45 Figure 35 Wiring Diagram Honeywell EI USA Continuous Circulation...
Страница 46: ...46 Figure 36 Wiring Diagram Honeywell EI USA Intermittent Circulation...
Страница 47: ...47 Figure 37 Wiring Diagram Honeywell EI Canada Continuous Circulation...
Страница 48: ...48 Figure 38 Wiring Diagram Honeywell EI Canada Intermittent Circulation...
Страница 50: ...50 Figure 39 Wiring Diagram Johnson EI USA Continuous Circulation...
Страница 51: ...51 Figure 40 Wiring Diagram Johnson EI USA Intermittent Circulation...
Страница 52: ...52 Figure 41 Wiring diagram Johnson EI Canada Continuous Circulation...
Страница 53: ...53 Figure 42 Wiring Diagram Johnson EI Canada Intermittent Circulation...
Страница 55: ...55 Figure 43 Wiring Diagram EP EP CSD 1 Ignition System USA Continuous Circulation...
Страница 56: ...56 Figure 44 Wiring Diagram EP EP CSD 1 Ignition System USA Intermittent Circulation...
Страница 60: ...60 Figure 49 Lighting Instructions 24V Standing Pilot...
Страница 61: ...61 Figure 50 Operating Instructions EI...
Страница 62: ...62 Figure 51 Lighting Instructions OP...
Страница 63: ...63 Figure 52 Operating Instructions EP...
Страница 71: ...71 Honeywell EI Trouble Shooting Guide...
Страница 72: ...72 Johnson EI Trouble Shooting Guide...
Страница 73: ...73...
Страница 74: ...74 SERVICE RECORD DATE SERVICE PERFORMED...
Страница 94: ...94...
Страница 97: ...97...