I. Pre-Installation
a. Front: 18"
b. Top: 36"
c. Draft hood, rear, sides and flue connector: 6"
2. USA, 808B-810B: for installation in room which is
large in comparison with size of boiler.
a. Front: 18"
b. Top: 51½"
c. Draft hood, rear, sides, and flue connector: 6"
3. Canada, 805B-810B:
a. Top and front: 18" (45.7cm)
b. Flue, rear and sides: 6" (15.2cm)
D.
Provide clearance for servicing
and proper operation
(following clearances are recommended and may be
reduced to minimum clearances shown above):
1. Single boiler, 805B-807B, Front/Top: 24" (61cm)
2. Single boiler, 808B-810B, Front/Top: 48" (122cm)
3. Multiple/modular boiler, USA/Canada, Sides:
1" (2.5cm)
E.
Install boiler on level floor
as close to chimney as
possible. For basement installation provide a solid base
such as concrete or masonry construction if floor is not
level or if water may be encountered on floor around
boiler.
F.
Protect gas ignition system components
from water
(dripping, spraying, rain, etc.) during boiler operation
and service (circulator replacement, control
replacement, etc.).
G.
Provide combustion and ventilation air
in
accordance with applicable provisions of local building
codes, or the
National Fuel Gas Code
, NFPA 54/ANSI
Z223.1, Section 5.3, Air for Combustion and
Ventilation; or CAN/CGA B149 Installation Codes,
Part 5, Venting Systems and Air Supply for
Appliances.
A.
Inspect shipment
carefully for any signs of damage.
All equipment is carefully manufactured, inspected and
packed. Our responsibility ceases upon delivery of
boiler to carrier in good condition. Any claim for
damage or shortage in shipment must be filed
immediately against carrier by consignee. No claims
for variances or shortages will be allowed by Boiler
Manufacturer, unless presented within sixty (60) days
after receipt of equipment.
B.
Installation must conform
to the requirements of the
authority having jurisdiction. In the absence of such
requirements, installation must conform to the
National Fuel Gas Code
, NFPA 54/ANSI Z223.1 and/
or CAN/CGA B149 Installation Codes. Where
required by the authority having jurisdiction, the
installation must conform to the
Standard for Controls
and Safety Devices for Automatically Fired Boilers
,
ANSI/ASME No. CSD-1.
C.
Provide clearance between combustible material
and boiler jacket (following clearances are minimums):
1. USA, 805B-807B: listed for Alcove installation
Table 2: Special Base Required for Installation on
Combustible Flooring
The following guideline is based on the
National Fuel
Gas Code
, NFPA 54/ANSI Z223.1.
1. Determine volume of space (boiler room). Rooms
communicating directly with space (through
permanent openings not furnished with doors) are
considered part of space.
Volume [ft³] = Length [ft] x Width [ft] x Height [ft]
2. Determine Total Input of all appliances in space.
Round result to nearest 1,000 Btu per hour (Btuh).
3. Determine type of space. Divide Volume by Total
Input.
G
N
I
N
R
A
W
n
o
i
t
a
l
l
a
t
s
n
i
r
o
f
d
e
i
f
i
t
r
e
c
n
g
i
s
e
d
s
i
e
c
n
a
i
l
p
p
A
r
o
F
.
y
l
n
o
g
n
i
r
o
o
l
f
e
l
b
i
t
s
u
b
m
o
c
n
o
n
n
o
y
l
n
o
g
n
i
r
o
o
l
f
e
l
b
i
t
s
u
b
m
o
c
n
o
n
o
i
t
a
l
l
a
t
s
n
i
e
l
b
a
T
n
i
d
e
t
s
i
l
e
s
a
b
l
a
i
c
e
p
s
n
o
d
e
l
l
a
t
s
n
i
n
e
h
w
.
g
n
i
t
e
p
r
a
c
n
o
d
e
l
l
a
t
s
n
i
e
b
t
o
n
t
s
u
m
r
e
l
i
o
B
.
2
s
i
h
c
i
h
w
e
t
e
r
c
n
o
c
n
o
d
e
l
l
a
t
s
n
i
s
i
r
e
l
i
o
b
n
e
h
W
g
n
i
t
l
e
m
o
t
t
c
e
j
b
u
s
s
i
t
a
h
t
l
a
i
r
e
t
a
m
a
r
e
v
o
l
a
i
c
e
p
s
e
h
t
,
)
.
c
t
e
,
g
n
i
b
u
t
t
n
a
i
d
a
r
X
E
P
,
C
V
P
(
t
o
n
s
i
d
a
p
e
t
e
r
c
n
o
c
A
.
d
e
s
u
e
b
t
s
u
m
e
s
a
b
.
g
n
i
r
o
o
l
f
e
l
b
i
t
s
u
b
m
o
c
t
c
e
t
o
r
p
o
t
t
n
e
i
c
i
f
f
u
s
G
N
I
N
R
A
W
e
r
o
f
e
b
s
n
o
i
t
c
u
r
t
s
n
i
l
l
a
d
a
e
r
y
l
l
u
f
e
r
a
C
l
l
a
w
o
l
l
o
f
o
t
e
r
u
l
i
a
F
.
r
e
l
i
o
b
g
n
i
l
l
a
t
s
n
i
e
s
u
a
c
n
a
c
r
e
d
r
o
r
e
p
o
r
p
n
i
s
n
o
i
t
c
u
r
t
s
n
i
.
h
t
a
e
d
r
o
y
r
u
j
n
i
l
a
n
o
s
r
e
p
.
o
N
l
e
d
o
M
r
e
l
i
o
B
r
e
b
m
u
N
t
r
a
P
e
s
a
B
l
a
i
c
e
p
S
B
5
0
8
5
5
0
6
1
8
1
6
B
6
0
8
5
6
0
6
1
8
1
6
B
7
0
8
5
7
0
6
1
8
1
6
B
8
0
8
5
8
0
6
1
8
1
6
B
9
0
8
5
9
0
6
1
8
1
6
B
0
1
8
5
0
1
6
1
8
1
6
G
N
I
N
R
A
W
r
i
a
n
o
i
t
a
l
i
t
n
e
v
d
n
a
n
o
i
t
s
u
b
m
o
c
e
t
a
u
q
e
d
A
r
e
p
o
r
p
e
r
u
s
s
a
o
t
d
e
d
i
v
o
r
p
e
b
t
s
u
m
.
n
o
i
t
s
u
b
m
o
c
Содержание 805B
Страница 11: ...11 Figure 6 Flame Roll out Switch Installation Figure 7 Burner Burner Access Panel Installation...
Страница 13: ...13 Figure 8 Jacket Assembly...
Страница 14: ...14 Figure 9 EP OP Control Installation...
Страница 17: ...17 Figure 10 Schematic Gas Piping 24V Standing Pilot 806B 807B...
Страница 18: ...18 Figure 11 Main Gas Piping Intermittent Ignition EI...
Страница 19: ...19 Figure 12 Schematic Pilot Piping Honeywell EI USA...
Страница 20: ...20 Figure 13 Schematic Pilot Piping Honeywell EI Canada Natural Gas 805B 810B LP Gas 806B 807B...
Страница 21: ...21 Figure 14 Schematic Pilot Piping Johnson EI USA...
Страница 22: ...22 Figure 15 Schematic Pilot Piping Johnson EI Canada Natural Gas 805B 810B LP Gas 806B 807B...
Страница 23: ...23 Figure 16 Schematic Gas Piping OP Control System 806B 810B...
Страница 24: ...24 Figure 17 Schematic Gas Piping OP CSD 1 Control System 808B 810B...
Страница 25: ...25 Figure 18 Schematic Gas Piping EP Control System Natural Gas Only 806B 810B...
Страница 26: ...26 Figure 19 Schematic Gas Piping EP CSD 1 Control System 808B 810B...
Страница 30: ...30 Figure 25 Recommended Boiler Piping for Circulator Zoned Heating Systems...
Страница 39: ...39 Figure 31 Wiring Diagram Standing Pilot 24 USA and Canada Continuous Circulation...
Страница 40: ...40 Figure 32 Wiring Diagram Standing Pilot 24V USA and Canada Intermittent Circulation...
Страница 42: ...42 Figure 33 Wiring Diagram OP OP CSD 1 Ignition System Continuous Circulation...
Страница 43: ...43 Figure 34 Wiring Diagram OP OP CSD 1 Ignition System Intermittent Circulation...
Страница 45: ...45 Figure 35 Wiring Diagram Honeywell EI USA Continuous Circulation...
Страница 46: ...46 Figure 36 Wiring Diagram Honeywell EI USA Intermittent Circulation...
Страница 47: ...47 Figure 37 Wiring Diagram Honeywell EI Canada Continuous Circulation...
Страница 48: ...48 Figure 38 Wiring Diagram Honeywell EI Canada Intermittent Circulation...
Страница 50: ...50 Figure 39 Wiring Diagram Johnson EI USA Continuous Circulation...
Страница 51: ...51 Figure 40 Wiring Diagram Johnson EI USA Intermittent Circulation...
Страница 52: ...52 Figure 41 Wiring diagram Johnson EI Canada Continuous Circulation...
Страница 53: ...53 Figure 42 Wiring Diagram Johnson EI Canada Intermittent Circulation...
Страница 55: ...55 Figure 43 Wiring Diagram EP EP CSD 1 Ignition System USA Continuous Circulation...
Страница 56: ...56 Figure 44 Wiring Diagram EP EP CSD 1 Ignition System USA Intermittent Circulation...
Страница 60: ...60 Figure 49 Lighting Instructions 24V Standing Pilot...
Страница 61: ...61 Figure 50 Operating Instructions EI...
Страница 62: ...62 Figure 51 Lighting Instructions OP...
Страница 63: ...63 Figure 52 Operating Instructions EP...
Страница 71: ...71 Honeywell EI Trouble Shooting Guide...
Страница 72: ...72 Johnson EI Trouble Shooting Guide...
Страница 73: ...73...
Страница 74: ...74 SERVICE RECORD DATE SERVICE PERFORMED...
Страница 94: ...94...
Страница 97: ...97...