
34
E.
Boiler Equipped With Vent Damper.
See Figure 28.
1. Open Vent Damper Carton and remove Installation
Instructions. Read Installation Instructions
thoroughly before proceeding.
Figure 28: Vent Damper Installation
2. Vent damper must be same size as draft hood outlet.
See Figure 1. Unpack vent damper carefully. Forcing
vent damper open or closed may damage gear train
and void warranty. Vent damper assembly includes
pre-wired connection harness with polarized plug.
3. Mount vent damper assembly on draft hood without
modification to either (Refer to instructions packed
with vent damper for specific instructions). Vent
damper position indicator to be visible to users.
F.
Install Vent Connector
from draft hood or vent damper
to chimney. See Figure 29. For modular or multiple
boiler installations, review
"Multiple-Modular Manual
for Series 8B Gas Boilers
", P/N 8141615.
1. Do not connect into same leg of chimney serving an
open fireplace.
2. Where two or more appliances vent into a common
vent, the area of the common vent should at least
equal the area of the largest vent plus 50 % of the
area of the additional vents. Do not connect the
vent of this appliance into any portion of mechanical
draft system operating under positive pressure.
3. Vent connector should have the greatest possible
initial rise above the draft hood consistent with the
head room available and the required clearance from
adjacent combustible building structure.
4. Install vent connector above bottom of chimney to
prevent blockage - inspect chimney for obstructions
or restrictions and remove - clean chimney if
necessary.
5. Vent connector should slope upward from draft
hood to chimney not less than one inch in four feet.
No portion of vent connector should run downward
or have dips or sags. Vent connector must be
securely supported.
6. Use thimble where vent connector enters masonry
chimney - keep vent connector flush with inside of
flue liner.
7. Do not install Non-listed (AGA, CGA, CSA, ETL, or
UL) vent damper or other obstruction in vent pipe.
8. Locate Boiler as close to Chimney as possible
consistent with necessary clearances. See Section I:
Pre-Installation.
N
O
I
T
U
A
C
o
w
t
l
o
r
t
n
o
c
o
t
r
e
p
m
a
d
t
n
e
v
e
n
o
e
s
u
t
o
n
o
D
.
s
e
c
n
a
i
l
p
p
a
g
n
i
t
a
e
h
e
r
o
m
r
o
N
O
I
T
U
A
C
-
g
n
i
c
i
v
r
e
s
r
o
f
e
c
n
a
r
a
e
l
c
e
t
a
u
q
e
d
a
e
d
i
v
o
r
P
n
e
e
w
t
e
b
e
c
n
a
r
a
e
l
c
m
u
m
i
n
i
m
"
6
e
d
i
v
o
r
p
.
n
o
i
t
c
u
r
t
s
n
o
c
e
l
b
i
t
s
u
b
m
o
c
d
n
a
r
e
p
m
a
d
Содержание 805B
Страница 11: ...11 Figure 6 Flame Roll out Switch Installation Figure 7 Burner Burner Access Panel Installation...
Страница 13: ...13 Figure 8 Jacket Assembly...
Страница 14: ...14 Figure 9 EP OP Control Installation...
Страница 17: ...17 Figure 10 Schematic Gas Piping 24V Standing Pilot 806B 807B...
Страница 18: ...18 Figure 11 Main Gas Piping Intermittent Ignition EI...
Страница 19: ...19 Figure 12 Schematic Pilot Piping Honeywell EI USA...
Страница 20: ...20 Figure 13 Schematic Pilot Piping Honeywell EI Canada Natural Gas 805B 810B LP Gas 806B 807B...
Страница 21: ...21 Figure 14 Schematic Pilot Piping Johnson EI USA...
Страница 22: ...22 Figure 15 Schematic Pilot Piping Johnson EI Canada Natural Gas 805B 810B LP Gas 806B 807B...
Страница 23: ...23 Figure 16 Schematic Gas Piping OP Control System 806B 810B...
Страница 24: ...24 Figure 17 Schematic Gas Piping OP CSD 1 Control System 808B 810B...
Страница 25: ...25 Figure 18 Schematic Gas Piping EP Control System Natural Gas Only 806B 810B...
Страница 26: ...26 Figure 19 Schematic Gas Piping EP CSD 1 Control System 808B 810B...
Страница 30: ...30 Figure 25 Recommended Boiler Piping for Circulator Zoned Heating Systems...
Страница 39: ...39 Figure 31 Wiring Diagram Standing Pilot 24 USA and Canada Continuous Circulation...
Страница 40: ...40 Figure 32 Wiring Diagram Standing Pilot 24V USA and Canada Intermittent Circulation...
Страница 42: ...42 Figure 33 Wiring Diagram OP OP CSD 1 Ignition System Continuous Circulation...
Страница 43: ...43 Figure 34 Wiring Diagram OP OP CSD 1 Ignition System Intermittent Circulation...
Страница 45: ...45 Figure 35 Wiring Diagram Honeywell EI USA Continuous Circulation...
Страница 46: ...46 Figure 36 Wiring Diagram Honeywell EI USA Intermittent Circulation...
Страница 47: ...47 Figure 37 Wiring Diagram Honeywell EI Canada Continuous Circulation...
Страница 48: ...48 Figure 38 Wiring Diagram Honeywell EI Canada Intermittent Circulation...
Страница 50: ...50 Figure 39 Wiring Diagram Johnson EI USA Continuous Circulation...
Страница 51: ...51 Figure 40 Wiring Diagram Johnson EI USA Intermittent Circulation...
Страница 52: ...52 Figure 41 Wiring diagram Johnson EI Canada Continuous Circulation...
Страница 53: ...53 Figure 42 Wiring Diagram Johnson EI Canada Intermittent Circulation...
Страница 55: ...55 Figure 43 Wiring Diagram EP EP CSD 1 Ignition System USA Continuous Circulation...
Страница 56: ...56 Figure 44 Wiring Diagram EP EP CSD 1 Ignition System USA Intermittent Circulation...
Страница 60: ...60 Figure 49 Lighting Instructions 24V Standing Pilot...
Страница 61: ...61 Figure 50 Operating Instructions EI...
Страница 62: ...62 Figure 51 Lighting Instructions OP...
Страница 63: ...63 Figure 52 Operating Instructions EP...
Страница 71: ...71 Honeywell EI Trouble Shooting Guide...
Страница 72: ...72 Johnson EI Trouble Shooting Guide...
Страница 73: ...73...
Страница 74: ...74 SERVICE RECORD DATE SERVICE PERFORMED...
Страница 94: ...94...
Страница 97: ...97...