Page 26
5.3.
Replacing Parts
For any spare parts that are required, please contact either your supplier or the manufacturer
directly. You will either need the
serial number
or: a) model name; b) the gas type; c) the
imitation fuel type; d) the type of control.
Only approved parts should be used.
5.4.
Pilot Assembly Replacement
NOTE:
If any part of the pilot assembly becomes faulty then the whole pilot
assembly will need changing.
1. Remove and replace the burner chassis
as detailed previous section.
2. Remove the HT lead from the end of the
electrode.
3. Cut the cable tie wrap.
4. Using
M9
spanner
undo
the
thermocouple connection from behind
the control valve
5. Using M10 spanner undo the pilot feed
RCF Advice:
This product may use Components (Coals, Ceramic backs) containing
Refractory Ceramic Fibres (RCF), which are man-made vitreous silicate fibres.
Excessive exposure to this material may cause irritation to eyes, skin and
respiratory tract.
Therefore during installation and servicing we recommend that you use a HEPA
filtered vacuum to remove any dust and soot accumulated in and around the fire
before and after working on the fire, to ensure that the release of fibres from
these RCF articles is kept to a minimum.
We recommend that you should follow the normal hygiene rules of not smoking,
eating or drinking in the work area.
When replacing Components containing Refractory Ceramic Fibres (RCF), we
recommend that the replaced items are not broken up, but are sealed within
heavy duty polythene bags, and clearly labelled as RCF waste. RCF waste may
be disposed of in suitably licensed landfill sites.
Содержание Surefire FCC 16
Страница 17: ...Page 15 4 3 General Dimensions...
Страница 22: ...Page 20...